Experienced engineering professional with strong leadership and project management skills. Action-oriented with strong ability to communicate effectively with technology, executive and business audiences, Worked as Engineer for CR Asia & YuhanTech.Co.Ltd for Shutdown projects in India and Kuwait Respectively . Presently appointed as Engineer for YuhanTech.Co.Ltd , Kuwait.
· Planning and Execution of Maintenance and catalyst handling.
· Responsible for Estimation of resources required for Major Overhaul & Turnaround. (Manpower, Tools, Consumables, Spares, Scaffolding and Heavy Equipment ,Etc).
· Co ordination with Planning, Operation, Inspection, Civil, process, engineering and other departments for Execution of Static Equipments maintenance.
· Execution of planning schedule for PM, Routine, Break down, Block shutdown, TA and Other activities.
· Responsible to maintain continuously the right quantity and quality of Manpower, Material,Equipment, Spares, tools, and Consumables.
· Productive utilization of Manpower for Day to day maintenance, Preventive and Shutdown and Turn around.
· Preparation of daily job schedule according to site conditions and to get the job done by minimum resources.
· Preparing all reports & reporting to the management about actual progress & required action plan to achieve the progress target.
· Responsible for proper execution of Work permit, hot, cold and excavation work permits and adhering to the SHE Procedure and system.
Type of jobs handled at YuhanTech Co.,Ltd, Kuwait
· Manpower Planing, Estimation, Resource mobilisation and job execution as Work Permit Holder for EOG 1 Catalyst replacement project in Shell Eastern Petroleum PTE LTD, Jurong Island during the month of March- April 2021.
· Engineer for CA/4085 Catalyst Unloading & Loading in KNPC MAA and SHU Refinery, Kuwait Through YuhanTech Co., Ltd, Kuwait.
· Engineer for CA/1465 Catalyst Unloading & Loading in KNPC MAB and SHU Refinery, Kuwait Through YuhanTech Co., Ltd, Kuwait.
· Successfully organized and carried out the shutdown turnaround activities for the following operational units. Including Catalyst Change outs in all major units.
· Atmospheric Residue De sulphurization Units(MAA-Unit-41,42,81&82, MAB unit-12, OCR, CFP-Unit-141)
· AGRP (Unit-20 & 21)
· Gas plant ( Unit -31,32,33)
· ERU ( Unit-35)
· Executed major catalyst Change out in all three KNPC refineries. Carried out safe work procedure and executed removal of agglomerated catalyst under inert atmosphere (IDLH).
· Contributed to continuous improvement of implementing new techniques for catalyst& rescue services.
· Mobilization of Specialized dense loading companies- Petroval, HPA, Edelhoff and Crealyst for dense loading activities as per KNPC request.
· Mobilization of shutdown Manpower (trained catalyst Technician) from India for execution of major shutdown.
· Catalyst Removal by Vacuum machine and vacuum trucks.
· Coke handling services with vacuum trucks and specialized tools.
· Close coordination with all Team leaders and contract custodian of all three KNPC refineries.
· Recruiting and Training of fresh employees for vessel entry under both atmospheric and inert condition with helmet type – life support system.
· Modification of Drill machine to suit agglomerated reactors for drilling and hydro jetting.
Authorized HSE training Attended:
· Confined space entrant authorized from Kuwait National Petroleum Company.
· Basic HSE induction program.
· Approved and certified for the operation of Life Support system by Edelhoff technology, Germany.
Major Projects offered by CR Asia successfully Accomplished
In Plant training at Mangalore Refinery and Petrochemical Limited,(12.012012 to 22.01.2012).
Planning& scheduling Tools & Techniques (Primavera P6)approved by Project Management Institute(PMI)
Supervision of Catalyst Loading in Primary Reformer Tubes With UNIDENSE Technology.