Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic
Ali Kassab

Ali Kassab

PMP® PMI-RMP®
Kuwait City

Summary

As a Construction Manager in the civil sector, my responsibility is to ensure that each project progresses from concept to completion with a focus on resource efficiency and strict quality control. Grounded in engineering excellence, I devise plans and designs that define precise project parameters. Attention to detail is paramount in my approach to project planning and the creation of accurate technical drawings.

Throughout the lifespan of each project, I am deeply engaged, meticulously evaluating data to ensure we adhere to all regulatory standards. In an operational role, my goal is to apply my managerial expertise and technical knowledge to drive projects forward with efficiency. I place a strong emphasis on the intelligent use of construction materials and methods to achieve superior quality in every endeavor.

Overview

9
9
years of professional experience
6
6
years of post-secondary education
2
2
Certifications

Work History

Construction Manager

KNPC- LARSEN & TOUBRO Replacement Of Old And Obsolete Substation In KNPC MAA.
kuwait
2023.06 - 2023.11
  • Directed the demolition of an outdated substation and the construction of a new substation, complete with all finishing works, while adhering to strict timelines and safety regulations.
  • Coordinated with L&T and KNPC for the approval of construction materials, ensuring all products met the required quality and safety standards.
  • Authored detailed method statements, aligning with KNPC's safety and quality guidelines, and secured necessary approvals.
  • Developed comprehensive project schedules and milestones, effectively mapping out the project lifecycle to meet strategic objectives.
  • Formulated the project budget through meticulous cost estimation, optimizing resource allocation and financial planning.
  • Managed subcontractor engagements from the Request for Quotation (RFQ) stage to contract agreements, facilitating smooth document and gate pass transactions within KNPC's stringent policies.
  • Negotiated contracts with suppliers and subcontractors to confirm fair pricing and quality service.
  • Prepared Material Requirement Analysis (RAM) documentation and submitted it for KNPC's approval, guaranteeing supply chain efficiency.
  • Collaborated with safety engineers to prepare Comprehensive Task Risk Assessments (CTRAs) for critical tasks, enhancing the project's safety profile.
  • Oversaw the installation of gypsum partitions, false ceilings, and fire-rated steel doors with accessories, ensuring quality control and aesthetic integrity.
  • Conducted adequacy studies on the existing structures to ensure compatibility with new transformer installations, assessing structural integrity and necessary modifications.
  • Managed tiling work for floors and walls, ensuring the selection of materials for durability and compliance with design specifications.
  • Supervised the installation of sandwich panels and gypsum cladding, emphasizing thermal insulation and visual appeal.
  • Monitored subcontractor operations and applied effective time, resource, and money management strategies to delivery under-budget project completion.
  • Communicated daily with vendors to keep project fully operational.


Construction Manager

TechnoGas - Construction Of Nitrogen Pipeline From TechnoGas Facility Battery Limit To KNPC Refinery
kuwait
2023.05 - 2023.09
  • Expertly managed and coordinated the production of 750 precast foundations and pipe supports, ensuring seamless integration with factory processes while adhering to quality standards and site constraints.
  • Developed and implemented quality control plan to guarantee highest standards of workmanship.
  • Prepared detailed project estimates and reports for management review.
  • Led site personnel, including engineers and supervisors, in execution activities to secure on-time project delivery and uphold high-quality standards.
  • Proactively evaluated the needs for tools, materials, and equipment, overseeing their efficient utilization to promote cost-effectiveness.
  • Supervised on-site fabrication, including bar bending, cutting, and formwork, ensuring all concrete treatments were applied correctly for efficient cast-in-site operations.
  • Worked in tandem with engineering departments to address site constraints, facilitating the revision of drawings and accompanying calculations to sustain project continuity.
  • Played a crucial role in liaising with local authorities, ensuring prompt acquisition of work permits and readiness of all necessary supporting documents.
  • Diligently monitored adherence to project schedules, conducting daily site reviews to mitigate any potential scheduling challenges.
  • Instituted strict management of site material storage, ensuring safe handling and compliance with specified shelf lives according to material data sheets.
  • Successfully oversaw the execution of 20 underground road crossings utilizing open-cut methods, which included managing soil protection, dewatering, shoring, stepping, backfilling, and asphalt reinstatement activities.
  • Developed and implemented risk mitigation plan to reduce potential project delays and costs.

Construction Manager

KNPC - Additional 14” MOGAS IRT Line From MAA To SHU And Additional Inter-connection 12 & 14” Lines
Kuwait City
2021.07 - 2022.05

Project : Additional 14" MOGAS IRT Line from MAA to SHU and Additional Interconnection 12" and 14" Lines at Tankage Area .

  • Execution of Pipe sleeper foundations and structural supports , and erection of steel structure .
  • Arranging Dewatering systems and discharge points for foundations that are below Water table .
  • Performing Proper site survey and slit trenching and submitting reports along with cable detection to ensure safe execution of excavation activities.
  • Managed quality assurance and laboratory testing for soil and concreting activities.
  • Submitting Work Method Statements for various civil site activities including excavation , concrete , backfilling , steel structure erection exc.
  • Submitting FCNs to Client for review and approval based on site conditions , incorporating Company comments effectively .
  • Daily coordination with Contractors engineering departments to ensure timely release of FCN drawings with revised calculation sheets for client approval .
  • Submitting MARs on timely manner to ensure material approval prior job execution .
  • Effectively acquiring Recourses , materials , and equipment to ensure effective day to day productivity to meet planned project target dates .
  • Involved in CTRA and Risk Assessments identification prior to any critical task activity .
  • Make sure that all equipment are having third party certificates and to successfully complete safety inspections and get certificates prior to site mobilization.
  • Ensure all personnel who will be working in confined space area to complete confined space requirement on timely manner prior to job.
  • Attend weekly meetings with client to share site progress and discuss site concerns and recommendations .
  • Follow up on daily basis with client representatives to ensure client satisfaction in terms of quality , safety , site planning , site arraignments.
  • Ensure effective resource allocation and utilization to meet project schedule as per project plan.
  • Preparing and obtaining daily Cold and Hot work permits area wise and getting client necessary signatures smoothly and maintaining trust and confidence with client by not violating safety and quality rules and procedures.
  • Effectively completing RFI's for site activities in timely manner and avoid any rework by ensuring that work has been executed as per contract IFC drawings and specifications .
  • Verified completed projects met approved time, quality, and cost estimates.

Senior Project Engineer

MEW - Ministry Of Electricity And Water
Kuwait City
2018.03 - 2021.01

Project: Upgradation of Fuel supply network within Doha west power station.

  • Assessed scope and requirements to assist with project design determinations.
  • Adhered to timelines to meet quality assurance targets.
  • Developed accurate technical drawings to direct successful engineering projects.
  • Evaluated sites to determine soil adequacy for handling building foundation loads.
  • Oversaw worksite construction to coordinate with supervisors and guide projects.
  • Calculated risks during project development and managed risks throughout projects.
  • Planned and implemented large-scale engineering changes to achieve team objectives.
  • Determined and scheduled priorities as required to progress engineering work.
  • Reviewed progress controls for project quality assurance.
  • Liaised with company executives and project managers to acquire resources to move projects forward.
  • Generate daily, weekly, and monthly progress reports related to site activities, checking for any negative variations along with Planning Department.
  • Continuously monitor site progress against Project Management plans applying trend analysis to enhance efficiency.
  • Recommend effective solutions to rectify negative variations from Project Plan as well as develop mitigation plans for potential risks.
  • Execution of (3000 m3) of concrete by casting pipe sleepers , pipe structural supports , Electrical and control room building .
  • Execution of electrical and cable trenches and road crossing duct banks .
  • Coordinate with the Consultant Office to obtain drawing approvals incorporating their comments to ensure timely revision updates.
  • Support in the preparation of as-built drawings for invoicing purposes.
  • Participate in the erection of steel structures within the Project in a timely manner.
  • Oversee the installation and commissioning of Firefighting Systems (deluge skids).
  • Support in the execution of various instrumentation works as well as loop and function checks for systems and subsystems.
  • Actively involved in pre-commissioning and commissioning activities including but not limited to flushing, leak tests, purging, tie in works, etc.

Civil Project Engineer

CAP FRANCE BAT®
Kuwait
2016.07 - 2017.10

Project: Private Governmental Hangers and Buildings

  • Participate in all major activities related to the execution of multi-story buildings.
  • Oversee landscape execution activities.
    Supervise the execution of all waterproofing activities for both roof and underground structures.
  • Provide guidance to the Site Team, conducting regular inspections on all civil related works executed by subcontractors.
    Supervise the execution of infrastructure works such as fire prevention, irrigation, water systems, high-low current electrical works, etc.
  • Actively involved in the construction of underground water systems and septic tanks. Review the daily progress of the surveyors on site offering guidance when required. Coordinate with the other facets of the project including Mechanical, Electrical and Plumbing activities.
  • Coordinate with the Consultant Office related to all Civil Works ensuring that all necessary paperwork such as RFIs, DRWs, Material Submittals etc. are timely prepared and submitted.
  • Oversee the Quantity Surveying of all Civil Works such as concrete, steel, water proofing, excavation, backfill, finishing, etc.
  • Attend weekly meetings with subcontractors following up on the progress of the execution of works to ensure timely completion.
  • Prepare and submit daily, weekly, and monthly reports to the Project Manager highlighting actual site achievements comparing the same to Project Plan.
  • Analyzed survey reports, maps, blueprints and other topographical and geologic data to plan infrastructure and construction projects.
  • Developed cost estimates for planned projects to aid in costing and budget planning efforts.
  • Managed conceptual design projects while providing task management and technical contributions to multidisciplinary teams.
  • Monitored execution of contract work for compliance with design plans and specifications.
  • Prepared site reports and organized subcontractor invoices, codes documentation and schematics.
  • Developed safety awareness program consisting of construction safety audits and safety meetings.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.
  • Compiled and presented reports explaining project details to non-technical stakeholders.

Civil Site Engineer

Ahmadiah General Trading and Contracting Company Kuwait
kuwait
2015.01 - 2016.07

Project: National Bank of Kuwait (NBK) – New Headquarters

  • Civil inspection and supervision on construction works starting from site preparation, planning, excavation, reinforced concrete works and block works.
  • Supervision of installation and Construction of Raft foundation, Columns, Slab and Core of stair case.
  • Manage the contraction of finishes such as Brick works, Plaster, Painting and cladding sidebar works.
  • Preparing reports, minutes of meetings, payment process, calculating quantities, sample and testing of materials.
  • Inspect project site to monitor progress and adherence to design specification and safety protocols.
  • Advice managerial staff about design, Construction.
  • Assist contractor with construction details.
  • Prepare material lists and purchase orders for the projects.
  • Review plans, surveys, etc. prepared by other engineers for conformance with Civil Site Engineer's plans before submission.
  • Supervise, inspect, review or approve construction work done by others to ensure conformance with Civil Site Engineer's standards of quality workmanship and performance.
  • Conduct tests to ensure the quality of materials used.
  • Prepare technical reports regarding various structures.
  • Guarantee all materials used and work performed are as per specifications by implementing drawings, ensuring flawless field operations and high customer satisfaction.
  • Oversee an abundance of project documentation, including submitting RFIs, MIRs, MRS, inspection requests, and implementing material takeoffs.
  • Implement drawings on-site, ensuring everything meets specifications and checking those quality control meetings all requirements.
  • Managing and coordination at the construction site with different contractors.
  • Works with individual project managers and project engineers to develop budgets, schedules, and plans for various elements of a program or project.
  • Inspect construction site to monitor progress and assesses conformance to engineering plans, specifications and construction standards.
  • Manage and help staff members in construction, operations, or maintenance activities at project site.
  • Deep foundation and pile driving monitoring.
  • Monitors construction schedules with project and contractor schedulers to keep on track and to address problems that may cause delays.
  • Assists PM with monitoring of day-to-day construction and construction-related activities for all on-site project personnel relative to Safety, Quality, Schedule and Contract Compliance.

Education

MBA - Masters of Business Administration

Liverpool John Moores University
United Kingdom
2022.07 - Current

Bachelor of Engineering (BE) - Civil And Environmental Engineering

Beirut Arab University (BAU)
Beirut
2012.01 - 2016.05

High School Diploma -

Al Qalaa Secondary School
Lebanon
2011.06 - 2011.06

Skills

    Strategic thinking.

undefined

Certification

PROJECT MANAGEMENT PROFESSIONAL (PMP®)

Timeline

Construction Manager

KNPC- LARSEN & TOUBRO Replacement Of Old And Obsolete Substation In KNPC MAA.
2023.06 - 2023.11

Construction Manager

TechnoGas - Construction Of Nitrogen Pipeline From TechnoGas Facility Battery Limit To KNPC Refinery
2023.05 - 2023.09

MBA - Masters of Business Administration

Liverpool John Moores University
2022.07 - Current

RISK MANAGEMENT PROFESSIONAL (PMI-RMP®)

2021-08

Construction Manager

KNPC - Additional 14” MOGAS IRT Line From MAA To SHU And Additional Inter-connection 12 & 14” Lines
2021.07 - 2022.05

PROJECT MANAGEMENT PROFESSIONAL (PMP®)

2020-01

Senior Project Engineer

MEW - Ministry Of Electricity And Water
2018.03 - 2021.01

Civil Project Engineer

CAP FRANCE BAT®
2016.07 - 2017.10

Civil Site Engineer

Ahmadiah General Trading and Contracting Company Kuwait
2015.01 - 2016.07

Bachelor of Engineering (BE) - Civil And Environmental Engineering

Beirut Arab University (BAU)
2012.01 - 2016.05

High School Diploma -

Al Qalaa Secondary School
2011.06 - 2011.06
Ali KassabPMP® PMI-RMP®