Summary
Overview
Work History
Education
Skills
Timeline
ProjectManager

Asif Equbal Khan

Project Manager
Mahboula, Kuwait

Summary

Resourceful Project Manager with 14 years of expertise in organizing business operations, financial oversight and resource management to achieve smooth flow and project operations. Leads procurement of resources including equipment and supplies. Monitors projects by adhering to production schedule and budget, managing production team, identifying problems and providing targeted solutions.


Knowledgeable in accounting principles, bookkeeping, budget and financial management. Focused Project Manager adept at planning, directing and maintaining continuous operations in various departments. Experienced in directing manufacturing employees and keeping efficient production in accordance with quality standards. Applying creative and analytical approach to operations for continuous process improvement. Skilled at identifying or anticipating problems and providing solutions. Excels through mentoring, training and empowering team to excel in performance.

Overview

14
14
years of professional experience
8
8
years of post-secondary education

Work History

Project Manager

Arabi Company W.L.L
Subhan
08.2015 - Current
  • Updated operational methods and oversaw accounting procedures for improved efficiency.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Developed and initiated projects, managed costs and monitored performance.
  • Maintained relationships with material vendors to lower costs and diversify capabilities.
  • Provided fiduciary oversight to remain within budget constraints, recommending project adjustments where necessary.
  • Planned, designed and scheduled phases for large projects.
  • Orchestrated projects within strict timeframes and budget constraints by solving complex problems and working closely with senior leaders.
  • Made decisions independently and collaboratively on [Type]-related challenges.
  • Provided detailed product orders based on project drawings and technical specifications.
  • Accelerated progress by continually reviewing performance, budgets and project timelines.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Managed projects from procurement to commission.
  • Identified plans and resources required to meet project goals and objectives.
  • Drove team success through shared vision and recognition of quality performance.
  • Led project teams through design, construction and launch process.
  • Maintained compliance with regulatory parameters in complex projects with overlapping policies.
  • Maintained clear communication with precise technical writing to document and inform critical processes.
  • Provided detailed technical and operational direction in project challenges, consistently meeting deliverables according to deadlines.
  • Modified and directed project plans to meet organizational needs.
  • Facilitated communication between internal personnel, contractors and vendors for project cohesion.

Mechanical Engineer

Daeah E&C
Sadadiya
02.2014 - 08.2015
  • Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts and coordinate delivery timelines.
  • Altered and modified designs to meet requirements and eliminate malfunctions.
  • Conducted tolerance analysis at system and subsystem levels.
  • Suggested cost saving proposals on make-versus-buy analysis or alternative sourcing.
  • Communicated project requirements and areas for improvement in design review meetings.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Researched novel processes and fabrication techniques through academic and professional literature reviews.
  • Tested and analyzed equipment design and performance feasibility to determine potential ROI.
  • Utilized job-related software to produce outline designs.
  • Interfaced with development engineers, scientists and suppliers to resolve quality issues.
  • Identified deficiencies in mechanical processes to develop improvements.
  • Evaluated final product's overall performance, reliability and safety.
  • Designed ventilation systems for cleanrooms and general manufacturing facilities.
  • Evaluated damage and damage tolerance of new composite material systems.
  • Educated clients on more energy-efficient solutions for old systems that meet project requirements for timelines and budgets.
  • Performed pre-construction, quality and safety management, as well as constructability review, start-up and commissioning.
  • Surveyed potential project sites before design, checking for space restrictions, mechanical feasibility and manufacturers guidelines.
  • Drafted assemblies, models and other technical drawings.
  • Specified system components and directed product modifications to comply with engineering design and performance specifications.
  • Reviewed designs and counseled [Type] clients on courses of action to remedy issues while staying under-budget and sticking to timelines.
  • Established [Type] system to promote increased reliability and profitability.
  • Supported data center power and cooling infrastructure and consistently applied critical facility operational best practices.
  • Created models, assemblies and drawings using Pro-Engineer, Pro-Sheetmetal, Pro-Process and Pro-Surface.
  • Tested newly installed systems, closely monitoring functionality and adherence to operating specifications.
  • Troubleshot and diagnosed [Type] equipment issues, quickly made plans for repairs and monitored use to rectify issues.
  • Applied technical troubleshooting to create quality HVAC and air control solutions.
  • Examined existing documents and blueprints to best update and maintain project records.
  • Liaised effectively between [Type] department and [Type] facility, keeping parties informed of project changes.
  • Applied mechanical problem solving skills to develop creative solutions for quality products.
  • Eliminated ineffective product line materials to resolve performance challenges and mitigate corrosion.
  • Identified suitable materials for production use that aligned with environmental concerns and budget constraints.

Pipeline Integrity Engineer

Alghanim International Gen. Trad. & Cont. Co.
Ahmadi
10.2011 - 02.2014
  • Oversaw calculation of technical specifications for use in procurement of piping components and raw materials.
  • Created 3D models and 2D drawings of planned piping structures and designs.
  • Participated in design reviews for new construction, analyzing planned piping, conduits and engineering models.
  • Performed system analyses of established user equipment and proposed plans, providing in-depth data on discovered issues.
  • Drafted system functionality and performance requirements by integrating production and budgetary goals.
  • Assisted project planning teams by providing data on scheduling, cost estimations and project scope calculations.
  • Prepared engineering calculations for hydraulic models, stress analyses and other simulations and plans.
  • Applied mechanical problem solving skills to develop creative solutions for quality products.
  • Delegated tasks to entry-level engineers, closely monitoring work to monitor quality, maintain speed and exceed daily project goals.
  • Incorporated solutions that met various project challenges and adhered to environmental, packaging and vibration requirements.
  • Supported data center power and cooling infrastructure and consistently applied critical facility operational best practices.
  • Tested newly installed systems, closely monitoring functionality and adherence to operating specifications.
  • Eliminated ineffective product line materials to resolve performance challenges and mitigate corrosion.
  • Identified suitable materials for production use that aligned with environmental concerns and budget constraints.
  • Created models, assemblies and drawings using Pro-Engineer, Pro-Sheetmetal, Pro-Process and Pro-Surface.

Electromechanical Engineer

Arabian Supplies & Contracting Co.
Ruwi
10.2010 - 09.2011
  • Administered both energized and de-energized testing on multi-design change packages.
  • Performed in-depth electrical acceptance testing of completed hardware.
  • Validated product and subsystem performance through simulation and laboratory testing.
  • Monitored manufacturing operations of electrical devices for compliance with safety protocols.
  • Evaluated power needs for various systems.
  • Developed engineering documentation detailing system requirements and diagnostic procedures.
  • Read and analyzed blueprints and project documentation to develop workflows and strategy.
  • Leveraged mastery of AutoCAD Electrical Toolset to develop and document electrical schematics.
  • Calibrated and repaired existing systems to maintain functionality.
  • Mentored junior engineers and new hires in job-specific tasks and application of electrical processes.
  • Verified viability and compliance for systems and circuits.
  • Inspected and performed validation testing for designed systems and third-party installations.
  • Used established formulae to calculate current loads and short circuit currents.
  • Inspected completed installations to observe operations and verify conformance to design and equipment specifications.
  • Prepared technical documentation for operation, troubleshooting and maintenance of industrial systems.
  • Performed maintenance procedures and repairs on existing electrical products and systems.
  • Identified specific cables, fuses and circuit breakers required for assigned installations.
  • Provided on-site engineering and technical services during installation and fielding processes.
  • Supervised construction and pre-commissioning of electrical rooms and substations.
  • Estimated project costs and resource allocation to forecast budget requirements and monitor adherence.

Piping Engineer

Gopinath Engineering Pvt. Ltd. Co
Chembur
10.2008 - 09.2010
  • Contributed to technical memos and reports by providing planning and analytical data on [Area of expertise].
  • Performed system analyses of established user equipment and proposed plans, providing in-depth data on discovered issues.
  • Assisted project planning teams by providing data on scheduling, cost estimations and project scope calculations.
  • Prepared engineering calculations for hydraulic models, stress analyses and other simulations and plans.
  • Created 3D models and 2D drawings of planned piping structures and designs.
  • Oversaw calculation of technical specifications for use in procurement of piping components and raw materials.
  • Drafted system functionality and performance requirements by integrating production and budgetary goals.
  • Participated in design reviews for new construction, analyzing planned piping, conduits and engineering models.
  • Applied mechanical problem solving skills to develop creative solutions for quality products.
  • Specified system components and directed product modifications to comply with engineering design and performance specifications.
  • Incorporated solutions that met various project challenges and adhered to environmental, packaging and vibration requirements.
  • Designed budgets and cost estimates for projects with speed and accuracy while working closely with clients, drafters and employees to determine best courses of action.
  • Examined existing documents and blueprints to best update and maintain project records.
  • Drafted assemblies, models and other technical drawings.
  • Tested newly installed systems, closely monitoring functionality and adherence to operating specifications.
  • Developed internal processes and plans for mechanical verification, product development and factory processes.
  • Identified suitable materials for production use that aligned with environmental concerns and budget constraints.

Education

Bachelor of Science - Mechanical Engineering

Siwan Engineering & Technical Institute
Siwan, India
10.2004 - 10.2008

Associate of Science - Science Education

Bhagwanpur College
Bhagwanpur, Siwan, India
06.2002 - 07.2004

High School Diploma -

Islamia High School Siwan
Siwan, India
01.2001 - 06.2002

Skills

Strategic planning

undefined

Timeline

Project Manager

Arabi Company W.L.L
08.2015 - Current

Mechanical Engineer

Daeah E&C
02.2014 - 08.2015

Pipeline Integrity Engineer

Alghanim International Gen. Trad. & Cont. Co.
10.2011 - 02.2014

Electromechanical Engineer

Arabian Supplies & Contracting Co.
10.2010 - 09.2011

Piping Engineer

Gopinath Engineering Pvt. Ltd. Co
10.2008 - 09.2010

Bachelor of Science - Mechanical Engineering

Siwan Engineering & Technical Institute
10.2004 - 10.2008

Associate of Science - Science Education

Bhagwanpur College
06.2002 - 07.2004

High School Diploma -

Islamia High School Siwan
01.2001 - 06.2002
Asif Equbal KhanProject Manager