Summary
Overview
Work History
Education
Skills
Affiliations
Accomplishments
Software
Interests
Work Availability
Quote
Timeline
ProjectManager

Elsaid Abouserour

Project Manager
Kuwait

Summary

Deadline-driven and quality-focused Project Manager with 15 years of experience in project management, HVAC, Firefighting piping design/industrial design/mechanical process engineering. Skilled Interpersonal communicator able to successfully manage subcontractors and coordinate project management aspects. Bi- lingual (Arabic - English) workflow supervisor who consistently accomplishes Projects ahead of schedule and within budget.

Overview

24
24
years of professional experience
1
1
year of post-secondary education

Work History

Project Manager

ABC
07.2012 - Current
  • Ensuring the correct processes are followed throughout all phases of the projects
  • Manages a team responsible for the design and implementation of manufacturing processes, equipment, or plants
  • Responsible for operational excellence via efficient plant design
  • Mentor and train junior engineers on design of piping systems to ensure the redundancy of processing solutions
  • Plans and directs all aspects of processing activities within company
  • Ensures all engineering projects, initiatives, and processes are in conformance with organization's established policies and objectives
  • Design and upgrade equipment such as sterile tanks, pipelines, swing panels, and instruments to ensure the smooth production and to produce and new products
  • Served as a project manager for one of the most critical projects at Arabian Beverage Company this was “design sterile tanks’ systems for full utilization of Dairy Processing and for efficient CIP.”
  • Performs a variety of tasks
  • Leads and directs the work of others
  • A wide degree of creativity and latitude is expected
  • Typically reports to a head of a unit/department.

Project Manager

ABC
Kuwait
06.2014 - 12.2016
  • Project Driver/Objectives


  • To build new warehouse for RM including Freezer, chiller , heater & special room for storing chemical
  • To store raw material for production as per their requirement
  • To reduce shifting of RM from Mina Abdullah warehouse to Subhan warehouse
  • Approach
  • Excavation and concrete works for Basement floor
  • Ground Floor and Mezzanine concrete and Kirby works
  • Insulation of Air condition works ( AHU chiller , pipe line , pumps )
  • Insulation of Fire Fighting works ( underground tank , pumps, pipe line )
  • Construct of Cold room & Freezer room works, Heating room & chemical room
  • Insulation of Ventilation system
  • Construct of Drainage connection & municipal line.

Project Manager

ABC
Kuwait
06.2014 - 12.2016

1200 M2 New Raw Material store.


Project Driver/Objectives
  • To build new warehouse for RM including Freezer, chiller, heater & special room for storing chemical.
  • To store raw material for production To reduce shifting of RM from Mina Abdullah warehouse to Subhan warehouse.


Approach

  • Excavation and concrete works for Basement floor.
  • Ground Floor and Mezzanine concrete and Kirby works.
  • Insulation of Air condition works (AHU chiller, pipe line, pumps
  • Insulation of Fire Fighting works (underground tank, pumps, pipe line).
  • Construct of Cold room & Freezer room works, Heating room & chemical room.
  • Insulation of Ventilation system.
  • Construct of Drainage connection & municipal line.

Project Manager

ABC
Kuwait
11.2013 - 11.2014

3575 m2 New Warehouse PROJECT

Project Driver/Objectives

  • Construct a new Warehouse for storing finish good
  • Decrease the traffic load at outside loading area
  • Storing at least 1800 Pallets
  • Arranging the Loading area for local sales cars

Approach

  • Issue Approval Drawings and Calculations
  • Materials Fabrication and Delivery
  • Site Preparation, Survey and Prepare Civil Drawings
  • Excavation and Concrete Works
  • Steel and Electrical Works
  • Installation of Personal and 16 manual roll up doors.

Project Manager

10.2013 - 08.2014
  • Upgrading & optimizing for sterile tanks & CIP loops
  • Prorject Driver and Objectives
  • Reduce risk of unsterility by 20% & increase processing, utilization and flexibility( reduce installed capacity downtime by 16%),
  • Sterile tanks' system to be redesigned for full utilization,
  • Maintaining a relieble and secure feeding system for sterile tanks via Aseptomag valves
  • Decreasing the pressure inside the sterile tanks to increase the lifetime of equipment and instruments
  • Approach upgrading the feeding valves of strile tanks to Aseptomag valves
  • Utilizing all ports of exisiting Sterile tank1 flow plate and adding a new similar one for Sterile tank 2,
  • Adding 2 x booster pumps in the return to sterile tanks' CIP return lines
  • Automating and Optimizing product feeding lines and CIP loops for both sterile tanks.

Section in Charge

ABC
Kuwait
05.2007 - 04.2012
  • Developed and maintained courteous and effective working relationships.
  • Proven ability to learn quickly and adapt to new situations.
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Worked flexible hours across night, weekend and holiday shifts.
  • Worked effectively in fast-paced environments.
  • Demonstrated strong organizational and time management skills while managing multiple projects.
  • Passionate about learning and committed to continual improvement.
  • Excellent communication skills, both verbal and written.
  • Created and maintained project documentation to establish operations framework and enable adherence to preset guidelines.
  • Managed project technical, schedule and cost risk factors to facilitate completion while minimizing negative outcomes.
  • Collaborated with technical and administrative teams to develop and implement successful corrective plans.
  • Enforced health and safety protocols to promote safe working environment.

MECHANICAL ENGINEER

MIsr- Italy for food industries
Egypt
02.2005 - 01.2007
  • Planned and directed all aspects of processing activities within company.
  • Advised the project manager regarding product flow rates and quantity calculations.
  • Wrote daily detailed reports logging work progress for quality assurance purposes.
  • Produced the issue precise technical specifications and data sheets
  • Responsible for planning and executing both preventive and corrective maintenance.
  • Developed technical solutions to free the system from complicated vibration during high flow of CIP, by which the piping, instruments were steady to deliver constant flow to ensure an efficient CIP.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts, and coordinate delivery timelines.
  • Suggested cost saving proposals on make-versus-buy analysis or alternative sourcing.
  • Identified deficiencies in mechanical processes to develop improvements.

Education

Bachelor of Mechanical Engineering -

Mansoura University
09.2004 - 05.2004

Project Management Institute (PMI) - Project Management

PMI, Project Management Institute (PMI)
The USA
02.2017 - 01.2018

Certified by the Project Management - undefined

PMI

Risk Management Professional - Risk Management

PMI-RMP
The USA
01.2018 - 04.2018

Skills

AUTOCAD, and WPLUSundefined

Affiliations

DWARDS, BUSINESS ENGLISH @ AUK. Member in Egypt Society Member in Egypt Society of Engineers from 2004 to Present. Member in Kuwait Society of Engineers from 2008 to Present.

Accomplishments

    Being PMP,RMP and a certified PMP trainer, Kuwait University has granted me a 3 certificates in different years for the great work and efforts that were exerted to make training course "Project Management Professional" in its premises.

Software

ACAD, MS EXCEL, WORD, ORACLE JD EDWARD APPLICATIONS, IELTS, AUTOCAD, and WPLUS, ORACLE JD DWARDS, BUSINESS ENGLISH @ AUK

Interests

Reading, Meditatiion and Basketball

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Quote

The way to get started is to quit talking and begin doing.
Walt Disney

Timeline

Risk Management Professional - Risk Management

PMI-RMP
01.2018 - 04.2018

Project Management Institute (PMI) - Project Management

PMI, Project Management Institute (PMI)
02.2017 - 01.2018

Project Manager

ABC
06.2014 - 12.2016

Project Manager

ABC
06.2014 - 12.2016

Project Manager

ABC
11.2013 - 11.2014

Project Manager

10.2013 - 08.2014

Project Manager

ABC
07.2012 - Current

Section in Charge

ABC
05.2007 - 04.2012

MECHANICAL ENGINEER

MIsr- Italy for food industries
02.2005 - 01.2007

Bachelor of Mechanical Engineering -

Mansoura University
09.2004 - 05.2004

Certified by the Project Management - undefined

PMI
Elsaid AbouserourProject Manager