Summary
Overview
Work History
Education
Skills
Languages
Educational Training
Certification
Timeline
Generic
Hussain Ahmad

Hussain Ahmad

Al 'Adan Block 2 St 82 House 37

Summary

Highly motivated Production Engineer with comprehensive experience in process improvement, quality assurance and manufacturing. Exceptionally talented at investigating and sourcing new equipment and identifying and addressing technical issues. Dynamic professional possessing excellent planning, executing and monitoring capabilities.

Overview

1
1
year of professional experience
1
1
Certification

Work History

Production Engineer

Kirby Building Systems
2023.11 - Current
  • Digitized the use of SOP's in the plant to minimize new operator training times.
  • Frequently used SAP to monitor production reports and/or backlogs.
  • Assisted Production supervisor in monitoring 70+ Fabricators and Tack welders.
  • Performed root cause analysis and implemented corrective actions.
  • Applied lean manufacturing processes to enhance quality, reliability or cost-effectiveness.
  • Increased the departments capacity by identifying & elimination bottlenecks in the process.
  • Conducted root cause analyses to identify areas for improvement and implemented corrective actions accordingly.

Education

MBA - Masters of Business Administration

American University of The Middle East
Eqaila, KW
06.2026

BS/BA - Industrial And Systems Engineering

Shiley Marcos School of Engineering, University of San Diego
San Diego, CA
05.2023

Skills

  • Microsoft Office
  • Multitasking and Prioritization
  • R Studio
  • Effective Teamwork
  • Office organization
  • SAP
  • Root Cause Analysis
  • Scheduling Techniques
  • Six Sigma Methodology
  • 5S

Languages

Arabic
Proficient
C2
English
Proficient
C2

Educational Training


  • Thermal Sciences Design Spring 2021:

 Designed a renewable energy portfolio most suitable for USD's energy consumption


  • Six Sigma Process Improvement Project Spring 2022:

 Worked alongside the facilities warehouse to improve their current working process and applied DMAIC methodology which led to a decrease in both Lead Time and Process Time


  • Improving the Check-in Process at IHS Hillcrest Spring 2023:

 Evaluated IHS's current check-in process to use Simulation software to come up with multiple scenarios that the clinic can implement to reduce their labor costs without impacting patient wait times

Certification

  • Certified Six Sigma Green Belt

Timeline

Production Engineer

Kirby Building Systems
2023.11 - Current

MBA - Masters of Business Administration

American University of The Middle East

BS/BA - Industrial And Systems Engineering

Shiley Marcos School of Engineering, University of San Diego
  • Certified Six Sigma Green Belt
Hussain Ahmad