Piping Engineer with 15+ years’ experience in oil & gas infrastructure projects, specializing in pipeline routing, welding inspection, and hydrostatic testing. Proven ability to lead multi-disciplinary teams in remote environments while ensuring compliance with ASME and API standards. Extensive hands on experience of Projects Execution including Estimation & Tendering. Knowledge of Structural Design codes, Valves, Process Control Instruments including thorough knowledge of Piping Standards & Codes (ASTM, ASME, API, BS) and their use in design, analysis and calculation.
Overview
16
16
years of professional experience
6
6
Languages
Work History
Operations Manager
ATCO General Trd. & Cont. Co.
12.2021 - Current
Responsible for planning, designing, and overseeing the construction and commissioning of crude oil pipelines. This role ensures the pipeline infrastructure meets technical, safety, regulatory, and environmental standards while delivering projects on time and within budget
Manage a team consisting of KNPC and KOC approved engineers along with project engineers and executives, planning engineers, ware house engineer and other technical and non-technical personnel
In-Charge of execution of short term and long term Piping contracts with KNPC, KOC, JO & other K companies for supply of various oil field products
Supervised construction of 30 km 24” crude oil pipeline across desert terrain, including trenching, welding, and coating operations.
Coordinated daily work plans for a 50+ person crew, ensuring adherence to project timelines and safety protocols.
Managed hydrostatic testing procedures, ensuring compliance with API 1104 and project specifications.
Reduced construction downtime by 15% through optimized logistics and resource planning. Manage staff, organize work schedules and assign specific tasks
Identification of bids and technical and feasibility analysis of tender documents
Manage technical and commercial evaluation before and after bidding
Manage and resolve technical queries/issues from clients for ongoing projects as well as budgetary projects
Projects Execution Manager
Abdul Kareem AlYahya GTC
03.2018 - 11.2021
Directed trench and HDD pipeline installation across challenging terrain, coordinating contractors, supervising welding and coating, and ensuring record-keeping compliance.
Executed hydrostatic testing of 10” pipelines per ASME/ANSI codes, achieving zero non-conformance events.
Supported design-to-construction of a 25 km potable water pipeline, including earthworks, alignment drawing reviews, and materials management.
Ensured QA/QC for coating and cathodic protection systems, resulting in no field-failure incidents during first year of operation.
Attend & organize managerial as well as project meetings to keep all departments up to date with status of various projects as well as discuss ways to improve the estimation, design & drafting process
Take part in planning & preparation of P&IDs, take-off & Steel Fabrication Projects Site Costing & Quantification.
Independently handle BOQ calculation, layout & sizing of projects.
Piping Engineer
Arabi Company WLL
03.2014 - 03.2018
Oversee pipeline right-of-way (ROW) preparation, trenching, welding, coating, and installation.
Coordinate with Project Manager, Electrical and Civil teams, surveyors, and environmental consultants.
Manage and supervise site contractors and subcontractors.
Implement quality control and assurance protocols (NDT, hydrotesting, pigging, etc.).
Part of full EPC pipeline projects including a 50 km 36″ gas pipeline through desert terrain. Delivered on schedule and within a 5% cost variance.
Developed site-specific safety and emergency response plans; achieved 20 consecutive months with zero lost-time injury across multiple projects.
Support project scheduling, cost estimation, and resource planning.
Track progress against milestones and prepare technical and progress reports
Lead commissioning activities, including flushing, pressure testing, and integrity checks.
Ensure successful handover to operations teams and support initial startup phases.
Mechanical Engineer-Piping Layout and Execution
SASA Engineering Services
08.2012 - 01.2014
Involved in the development of Overall Plot Plan, Equipment Layout, Piping Material Specifications, Piping Routing Study, Vessel Nozzle Orientation and Platform Details, Plant Design Review
Provide piping input to Process Piping and instrumentation diagrams, Line designation table, Instrument specification sheets, Preparing material take-off requirements and isometric drawings for construction using PDMS
Preparing and reviewing valves datasheets, vendor technical specifications and bidders’ quotations.
Preparing piping safety instruction sheets with the required calculations for pipe wall thickness, Maximum allowable operating pressure, and test pressure with application of ASME B31.3
Reviewing Vendor Drawings, Documentation & Coordination with Clients
Sr. Piping Engineer
EagleBurgmann India Pvt. Ltd.
12.2011 - 05.2012
Managed the Planning, Manufacturing, Trouble Shooting and Dispatch of API Piping Plans for Mechanical Seal Support System including Detailed Study and MTO of various Process Piping, Process Management Instruments and Fabrication.
Projects Engineer
Al Hikmah Steel Fabrication Engineering LLC
11.2009 - 10.2011
Part of a Challenging Team involved in diverse range of works from Design and Fabrication to Budgetary Compliance and Supply Chain Management. Involved in reading and analyzing of P&ID and Piping Layout Drawings and preparation of BOQ, Costing, Procurement, Scheduling and Quality Control of various jobs to client specifications with strict budgetary guidelines.
Education
Certificate Course - In Piping Design & Management Including PDMS
01.2013
Bachelor Of Mechanical Engineering - undefined
University Of Pune
01.2009
Three Months Certificate Course - In Pro-E & Auto-CAD
01.2007
Senior Secondary Examination - CBSE XII
Army Public School
01.2004
Higher Secondary Examination - CBSE X
Army Public School
01.2002
Skills
Project Management and Execution
Piping Standards & Codes
Projects Planning
Pipe Spools Fabrication
Structural Fabrication
Vessels Fabrication
Piping Layout & Drafting
Total Quality Management
Kaizen
Six Sigma Techniques
Safety Compliance
Team Leading
Visa Status
Transferable Employment Visa No. 18, 285101804915
Personal Information
Date of Birth: 10/18/85
Nationality: Indian
Driving License: Kuwait, India
Marital Status: Married
Associations And Achievements
Member Of Organizing Committee of All India Annual Technical Competition VERISMO 2008,09
Participant and winner of various national level technical paper presentations.
Member Of Tech-Infotainment Group
WES Canada Certified Engineer; IELTS Score 10/10
Timeline
Operations Manager
ATCO General Trd. & Cont. Co.
12.2021 - Current
Projects Execution Manager
Abdul Kareem AlYahya GTC
03.2018 - 11.2021
Piping Engineer
Arabi Company WLL
03.2014 - 03.2018
Mechanical Engineer-Piping Layout and Execution
SASA Engineering Services
08.2012 - 01.2014
Sr. Piping Engineer
EagleBurgmann India Pvt. Ltd.
12.2011 - 05.2012
Projects Engineer
Al Hikmah Steel Fabrication Engineering LLC
11.2009 - 10.2011
Bachelor Of Mechanical Engineering - undefined
University Of Pune
Three Months Certificate Course - In Pro-E & Auto-CAD
Senior Secondary Examination - CBSE XII
Army Public School
Higher Secondary Examination - CBSE X
Army Public School
Certificate Course - In Piping Design & Management Including PDMS