Imran Ansari

Imran Ansari

Mumbai

Summary

Mechanical Engineer with 17 years of overseas experience in Oil and Gas refinery construction. Integration interface work for GBS-001 & GBS-002 at Artic LNG 2, Experienced in Mechanical clearance, Module Erection, Rotary & static equipment installation, Equipment internal installation, Piping Fabrication, Erection, & Installation & final handover. Installation of Rotary Equipment (Compressor & Pump). (Specialized for BOG:- Boil of gas compressor) TQ, CTC, & CTD PREPARATION, MOS, & PROCEDURE REVIEWING, Extensive Experience in various engineering practice specialization in Equipment engineering, (HEAT EXCHANGERS multipasses, PRESSURE VESSELS, BOILERS, REACTORS, Columns CONDENSORS, FLOATING HEAD TANK) Vast experience in piping, valve testing, hydrostatic testing, pneumatic testing, leak test. Quality assurance/Quality control, Execution of Equipment, Support works & Structure, final handover & mechanical clearance. Now looking to continue bringing a significant contribution in the field of Construction & Quality with well-established and reputed organization which offers scope for self-development, career enhancement and stability.

Overview

11
11
years of professional experience

Work History

Senior Project Construction Engineer

Velesstroy’OOO’
Murmansk
10.2023 - Current
  • Plan & execution for equipment installation as per completion of Module assembly
  • Make Preservation Job card as per the vendor requirement
  • Rotary Equipment alignment, centering and inspection with QC Inspector
  • Plan & execution of Subcontractor work, maintain the manhour and production progress of fabrication tonnage of steel structure
  • Execute daily Progress meeting, solve the issue which is related to steel structure material delivery, painting and transportation assembly parts of module fabrication
  • Execute transportation plan of Module deck for erection and installation
  • Executing the work with planned fabrication, installation and erection of module Deck assembly
  • Inspection control of valve, inspection control of flange management
  • Inspection of Final handover of Equipment, Piping reinstatement connection with connection to Equipment flanges.

Senior Project Engineer

Renaissance Heavy industries
Murmansk
06.2021 - 10.2023
  • Interface coordination with client for all discipline of work, Mechanical, piping, Electrical, Steel Structure Support, additional work
  • As per agreed Site instruction
  • Interface management paper work, time sheet preparation as per project codes
  • Interaction with specialists, partners, contractors and the customer of the project
  • Taking part in all ICM meetings for interface problem and action to be taken for smooth work flow
  • Preparing procedures for internal installation of equipment, Site instructions, for additional work
  • Make all procurement of all types of instrument and consumables which has to be used for Equipment installation and preservation works
  • Make Daily Progress Report for total manhours
  • Make target sheet for weekly and monthly production
  • Make Equipment Installation status as per manhours
  • Make Inspection of Equipment steel structure base support before installation (NDT must be completed)
  • Make incoming control with fabrication drawing of equipment
  • Make installation plan of equipment
  • Make procurement of project equipment bolts, nuts and its torqueing tool and clamp
  • Make installation Plan and Leading the team to Provide work front as per availability of module handover, & priority of Modules handed for erection
  • Controlling Man power and distributing Work for each subcontractor, Material issuing from SPMAT System from client monitors delivery status activities
  • Making all RFI (REQUEST FOR INSPECTION) dealing with clients
  • Follow all ITP procedures for installation and preservation
  • Conducting inspection with clients, for installation and preservation
  • Checking preservation activities after installation as per client requirements
  • Apply all Project described preservation procedures for all equipment.

Senior Mechanical Engineer

Renaissance Heavy industries
Murmansk
03.2019 - 04.2021
  • Wrote and revised Installation maintenance procedures
  • Conducted research to test and analyze feasibility, design, operation and performance of equipment, components, and systems
  • Researched novel processes and fabrication techniques through academic and professional literature reviews
  • Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts, and coordinate delivery timelines
  • Make Daily Progress Report target sheet for weekly and monthly production of installation and erection of Equipment
  • Make installation report as per daily work progress
  • Leading the team to Provide work front as per availability of material, & priority of areas handed for erection of equipment
  • Controlling Man power and distributing Work for each subcontractor, Material feeding for installation of equipment (bolts, nuts & washers), Monitors rotary equipment activities, Making all RFI (REQUEST FOR INSPECTION)
  • Conducting inspection with clients.

Senior Tank Engineer

Punj Lloyd SND BHD
Pengerang
11.2016 - 10.2018
  • Paid attention to detail while completing assignments
  • Proved successful working within tight deadlines and a fast-paced environment
  • Identified issues, analyzed information and provided solutions to problems
  • Used critical thinking to break down problems, evaluate solutions and make decisions
  • Developed strong organizational and communication skills through coursework and volunteer activities
  • Strengthened communication skills through regular interactions with others
  • Worked well in a team setting, providing support and guidance
  • Worked effectively in fast-paced environments
  • Managed time efficiently in order to complete all tasks within deadlines
  • Completed paperwork, recognizing discrepancies and promptly addressing for resolution
  • Applied effective time management techniques to meet tight deadlines
  • Gained strong leadership skills by managing projects from start to finish
  • Developed strong communication and organizational skills through working on group projects
  • Excellent communication skills, both verbal and written
  • Gained extensive knowledge in data entry, analysis and reporting
  • Acted as a team leader in group projects, delegating tasks and providing feedback
  • Leading the team of Fabrication Shop, provide work front as per availability of material & priority of areas handed for erection, Controlling Man power and distributing Work for each worker’s, Material feeding for TANK sketch wall Fabrication, monitors fabrication activities, Make Daily Progress Report, make target sheet for weekly and monthly production, proper storage of sketched wall plates in sequence, Dispatching fabricated wall plates for painting.

QA/QC PIPING & WELDING INSPECTOR

GS Neotek
Saudi Arabia
11.2016 - 10.2018
  • Proven ability to develop and implement creative solutions to complex problems
  • Worked flexible hours across night, weekend and holiday shifts
  • Delivered services to customer locations within specific timeframes
  • Paid attention to detail while completing assignments
  • Proved successful working within tight deadlines and a fast-paced environment
  • Learned and adapted quickly to new technology and software applications
  • Review of P&ID’s, and Isometric drawings
  • Coordinating with the client representative related to construction and Inspection activities
  • Preparation and submittal of as-built drawing for any changes made at site
  • Requesting for inspection (RFI) prior to plan & testing
  • Preparing the spool pack for traceability Attach all the Reports Such as Release Reports of Pipe Spools, Isometric Drawings, General Arrangement Plan Drawing, RFI Report, Checklist Etc., along with Inspection Report during Inspection with client inspector
  • Ensuring that all construction and Installation are in accordance with technical specifications, as per standards and approved material submittal
  • Inspect and Raise RFI’s for Internal Cleaning of Pipe Spools and for the pre-installation of the Fabricated Pipe Spools to the client QA/QC Piping Inspector for each inspected pipe spools and attendance at site for Witness/Hold Points Identifying the materials (Pipes, Flanges, Fittings, etc) as per the material takeoff lists during the fabrication
  • Co-ordination with the client inspection agencies and subcontractors at different stages of the construction of the plant
  • Preparation of pressure test (hydro, pneumatic and service) packages for the newly installed pipelines
  • Line checking and clearing the punch ‘A’ items before the pressure test on completed pipe lines
  • Review of Hydro Test Package
  • Identifying the test medium to be used for Hydro Test for Piping Lines in the Test Packages, inspecting the water to be used for Hydro Test Assure that all joints are exposed for examination during pressure test
  • Ensure that isolation or disconnection of equipment not to be tested
  • Check vents are open when filling and draining lines
  • Piping line check, witness hydro testing and review hydro test packages to verify completion of NDT requirements, gauge calibrations, verifying that pipe supports, hangers and guides have been installed in accordance with the piping drawings and the pipe support details, analyze the requirement of temporary supports for above ground piping during hydro test.

Lead Mechanical & Piping QA/QC INSPECTOR

GS Neotek
Jubail
11.2013 - 04.2014
  • Performed visual inspections and non-destructive tests where appropriate
  • Evaluated components and final products against quality standards and manufacturing specifications
  • Completed precise measurements using special tools
  • Reported repeated issues to supervisors and other departments, collaborating to identify issue roots and rectify problems
  • Communicated with production team members about quality issues
  • Monitored inventory levels to restock materials and maintain consistent supply
  • Resolved customer complaints by investigating problems and developing solutions
  • Participated in team meetings to discuss progress and results, providing ideas and suggestions for improvement
  • Identified and documented quality discrepancies for management to develop resolutions
  • Performed root cause analysis to identify and resolve defects, improving quality standards
  • Review of Quality plan and inspection test plan
  • Review Project procedures Develop project Construction Quality Plan and review & update the plan as appropriate Audit and monitor all Contractor Quality Programmers, advice the Discipline Supervisors, Field Superintendents and Site Manager of any shortfalls and provide specialist support
  • Interface with any 3rd party independent inspections/ Audits conducted by within project
  • Lead the internal Audits and preparing Audit reports based upon findings and observations
  • Follow up Audit reports
  • Preparing Quality Audit check list as per Audit scope which includes Organization, Document control, Control of records, Design control, Construction control, Inspection control, Material storage, Handling, Preservation, Testing and Measuring Equipment’s control, NCR control etc
  • Responsible for producing and executing the CLIENT Power Project Quality Plans/Work Instructions/ and Job Aids in line with project Business Management System, (BMS) and relevant country/regional practices and procedures
  • Receiving the approved drawing for inspection Incoming control of material Verify heat number, inspection during fabrication and erection such as plate cut length, edge preparation, fit-up, bending and forming, hot adjustment, bolt, nuts, washer, gasket and tolerances cleaning requirements
  • Inspection of PSV, NRV, FCV, as per tag
  • Inspection activities monitoring blasting and painting operations under controlled conditions using de-humidifier
  • Inspection of Installation of Spools and pipes at vessel connections.

Education

Bachelor of Engineering - Mechanical Engineering

Mumbai University
Mumbai
04-2009

Skills

  • FPSO
  • GBS MODULE FABRICATION
  • INSTALLATION
  • Skidding
  • Mechanical
  • Rotary Equipment Installation
  • Static Equipment Installation
  • Preservation
  • Internals installation
  • Piping
  • Fabrication
  • Installation
  • Erection
  • ISO RLM
  • Hydrotesting
  • Re-instatement
  • Steel Structure
  • Module fabrication
  • Stopper fabrication
  • SST
  • IST
  • EST Supports Fabrication
  • Seismic design
  • Revit proficiency
  • Stormwater Management

Positionapplied

Sr Project Engineer

Overseasexperience

  • Velesstroy’OOO’, Senior Project Construction Engineer, 10/13/23, PRESENT, Artic LNG 2, NOVA ENERGIES (ARTIC SPG), Murmansk Russia, Plan & execution for equipment installation as per completion of Module assembly. Make Preservation Job card as per the vendor requirement. Rotary Equipment alignment, centering and inspection with QC Inspector. Plan & execution of Subcontractor work, maintain the manhour and production progress of fabrication tonnage of steel structure. Execute daily Progress meeting, solve the issue which is related to steel structure material delivery, painting and transportation assembly parts of module fabrication. Execute transportation plan of Module deck for erection and installation. Executing the work with planned fabrication, installation and erection of module Deck assembly. Inspection control of valve, inspection control of flange management. Inspection of Final handover of Equipment, Piping reinstatement connection with connection to Equipment flanges.
  • Renaissance Heavy industries, Senior Project Engineer, 10/06/21, 10/10/23, Artic LNG 2, NOVA ENERGIES (ARTIC SPG), Murmansk Russia, Interface coordination with client for all discipline of work, Mechanical, piping, Electrical, Steel Structure Support, additional work As per agreed Site instruction Interface management paper work, time sheet preparation as per project codes. Interaction with specialists, partners, contractors and the customer of the project. Taking part in all ICM meetings for interface problem and action to be taken for smooth work flow. Preparing procedures for internal installation of equipment, Site instructions, for additional work. Make all procurement of all types of instrument and consumables which has to be used for Equipment installation and preservation works. Make Daily Progress Report for total manhours. Make target sheet for weekly and monthly production. Make Equipment Installation status as per manhours. Make Inspection of Equipment steel structure base support before installation (NDT must be completed). Make incoming control with fabrication drawing of equipment. Make installation plan of equipment. Make procurement of project equipment bolts, nuts and its torqueing tool and clamp. Make installation Plan and Leading the team to Provide work front as per availability of module handover, & priority of Modules handed for erection. Controlling Man power and distributing Work for each subcontractor, Material issuing from SPMAT System from client monitors delivery status activities, Making all RFI (REQUEST FOR INSPECTION) dealing with clients, Follow all ITP procedures for installation and preservation Conducting inspection with clients, for installation and preservation. Checking preservation activities after installation as per client requirements. Apply all Project described preservation procedures for all equipment.
  • Renaissance Heavy industries, Senior Mechanical Engineer, 03/29/19, 04/06/21, AMUR GAS PROCESSING PLANT (AGPP GPZ), SERVICE GAS (GASPROM), Amur Oblast Russia, Wrote and revised Installation maintenance procedures. Conducted research to test and analyze feasibility, design, operation and performance of equipment, components, and systems. Researched novel processes and fabrication techniques through academic and professional literature reviews. Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts, and coordinate delivery timelines. Make Daily Progress Report target sheet for weekly and monthly production of installation and erection of Equipment. Make installation report as per daily work progress. Leading the team to Provide work front as per availability of material, & priority of areas handed for erection of equipment. Controlling Man power and distributing Work for each subcontractor, Material feeding for installation of equipment (bolts, nuts & washers), Monitors rotary equipment activities, Making all RFI (REQUEST FOR INSPECTION). Conducting inspection with clients.
  • Punj Lloyd SND BHD, Senior Tank Engineer, 11/29/16, 10/16/18, Rapid Tank Farm Project PETRONAS, PETRONAS, PENGERANG MALAYSIA, Paid attention to detail while completing assignments. Proved successful working within tight deadlines and a fast-paced environment. Identified issues, analyzed information and provided solutions to problems. Used critical thinking to break down problems, evaluate solutions and make decisions. Developed strong organizational and communication skills through coursework and volunteer activities Strengthened communication skills through regular interactions with others. Worked well in a team setting, providing support and guidance. Worked effectively in fast-paced environments. Managed time efficiently in order to complete all tasks within deadlines. Completed paperwork, recognizing discrepancies and promptly addressing for resolution. Applied effective time management techniques to meet tight deadlines. Gained strong leadership skills by managing projects from start to finish. Developed strong communication and organizational skills through working on group projects. Excellent communication skills, both verbal and written. Gained extensive knowledge in data entry, analysis and reporting. Acted as a team leader in group projects, delegating tasks and providing feedback. Leading the team of Fabrication Shop, provide work front as per availability of material & priority of areas handed for erection, Controlling Man power and distributing Work for each worker’s, Material feeding for TANK sketch wall Fabrication, monitors fabrication activities, Make Daily Progress Report, make target sheet for weekly and monthly production, proper storage of sketched wall plates in sequence, Dispatching fabricated wall plates for painting.
  • GS Neotek, Lead Mechanical & Piping QA/QC INSPECTOR, 11/19/13, 04/12/14, SAUDI ELASTOMERS (PETRO KEMYA), DEALIM, JUBAIL SAUDI ARABIA, Performed visual inspections and non-destructive tests where appropriate. Evaluated components and final products against quality standards and manufacturing specifications. Completed precise measurements using special tools. Reported repeated issues to supervisors and other departments, collaborating to identify issue roots and rectify problems. Communicated with production team members about quality issues. Monitored inventory levels to restock materials and maintain consistent supply. Resolved customer complaints by investigating problems and developing solutions. Participated in team meetings to discuss progress and results, providing ideas and suggestions for improvement. Identified and documented quality discrepancies for management to develop resolutions. Performed root cause analysis to identify and resolve defects, improving quality standards. Review of Quality plan and inspection test plan. Review Project procedures Develop project Construction Quality Plan and review & update the plan as appropriate Audit and monitor all Contractor Quality Programmers, advice the Discipline Supervisors, Field Superintendents and Site Manager of any shortfalls and provide specialist support. Interface with any 3rd party independent inspections/ Audits conducted by within project. Lead the internal Audits and preparing Audit reports based upon findings and observations. Follow up Audit reports. Preparing Quality Audit check list as per Audit scope which includes Organization, Document control, Control of records, Design control, Construction control, Inspection control, Material storage, Handling, Preservation, Testing and Measuring Equipment’s control, NCR control etc. Responsible for producing and executing the CLIENT Power Project Quality Plans/Work Instructions/ and Job Aids in line with project Business Management System, (BMS) and relevant country/regional practices and procedures. Receiving the approved drawing for inspection Incoming control of material Verify heat number, inspection during fabrication and erection such as plate cut length, edge preparation, fit-up, bending and forming, hot adjustment, bolt, nuts, washer, gasket and tolerances cleaning requirements. Inspection of PSV, NRV, FCV, as per tag. Inspection activities monitoring blasting and painting operations under controlled conditions using de-humidifier. Inspection of Installation of Spools and pipes at vessel connections.
  • GS Neotek, QA/QC PIPING & WELDING INSPECTOR, 11/29/16, 10/16/18, EVA & UTILITY PROJECT, SIPCHEM, SAUDI ARABIA, Proven ability to develop and implement creative solutions to complex problems. Worked flexible hours across night, weekend and holiday shifts. Delivered services to customer locations within specific timeframes. Paid attention to detail while completing assignments. Proved successful working within tight deadlines and a fast-paced environment. Learned and adapted quickly to new technology and software applications. Review of P&ID’s, and Isometric drawings. Coordinating with the client representative related to construction and Inspection activities. Preparation and submittal of as-built drawing for any changes made at site. Requesting for inspection (RFI) prior to plan & testing. Preparing the spool pack for traceability Attach all the Reports Such as Release Reports of Pipe Spools, Isometric Drawings, General Arrangement Plan Drawing, RFI Report, Checklist Etc., along with Inspection Report during Inspection with client inspector. Ensuring that all construction and Installation are in accordance with technical specifications, as per standards and approved material submittal. Inspect and Raise RFI’s for Internal Cleaning of Pipe Spools and for the pre-installation of the Fabricated Pipe Spools to the client QA/QC Piping Inspector for each inspected pipe spools and attendance at site for Witness/Hold Points Identifying the materials (Pipes, Flanges, Fittings, etc) as per the material takeoff lists during the fabrication. Co-ordination with the client inspection agencies and subcontractors at different stages of the construction of the plant. Preparation of pressure test (hydro, pneumatic and service) packages for the newly installed pipelines. Line checking and clearing the punch ‘A’ items before the pressure test on completed pipe lines. Review of Hydro Test Package. Identifying the test medium to be used for Hydro Test for Piping Lines in the Test Packages, inspecting the water to be used for Hydro Test Assure that all joints are exposed for examination during pressure test. Ensure that isolation or disconnection of equipment not to be tested. Check vents are open when filling and draining lines. Piping line check, witness hydro testing and review hydro test packages to verify completion of NDT requirements, gauge calibrations, verifying that pipe supports, hangers and guides have been installed in accordance with the piping drawings and the pipe support details, analyze the requirement of temporary supports for above ground piping during hydro test.
  • Inter iron Marine CO. LTD., PIPING ENGINEER, 09/19/10, 10/12/11, Fujairah marine CO, Fujairah Shipping CO., UNITED ARAB EMIRATES, Provided remote analysis of in-situ piping using remote camera and sensing equipment. Oversaw calculation of technical specifications for use in procurement of piping components and raw materials. Fabrication and installation of spools for submarine engine (MATERIAL: -Copper Nickle, aluminum brass, pipe fabrication) Fujairah port U.A.E. Worked for conveyer belt 110 mtr long 1.5mtr width (Sharjah Cement factory) Maintenance work of all Cielo, pipe line and its conveyer belt.
  • QWALITY INTERNATIONAL CO. LTD., MECHANICAL ENGINEER, 08/12/09, 17/13/10, Water treatment project (ENTROPIE), -, FUJAIRAH FREE ZONE (UAE), Leading with all Clients, Preparation of Fabrication schedule on daily weekly and monthly basis, Lead and manage the team for the Project work, Prepare review notes for monthly co-ordination meetings at H.O. level, Make available all required inputs for overall work progress of Mechanical and other related areas.
  • N.I. ENGINEERING WORKS., FABRICATION INCHARGE, 01/01/08, 01/12/08, MANUFACTURING OF EQUIPMENT, -, SEEPZ INDUSTRIES MUMBAI (INDIA), FABRICATION OF HEAT EXCHANGERS, PRESSURE VESSELS, BOILERS, REACTORS, COLUMN, TRANSMITTER CABINETS.
  • P.G FABRICATORS., DRAFTSMAN. (PART TIME), 08/01/07, 01/12/09, -, MUMBAI (INDIA), Drafting & Preparing Hoist Crane Lift Blue print A2. (MANUAL DRAFTING).
  • HYPRECISION HYDRAULIK., TRAINEE ENGINEER, 06/01/05, 11/25/05, -, MITTAL ESTATE MUMBAI (INDIA), Designing the material specification as per client specification. Preparation of construction plan and Bill of Materials. Controlling the maintenance team during the pre-commissioning activities. Preparing the time sheet for additional work which is beyond our scope. Maintaining a daily site diary.

Personal Information

  • Passport Number: N5612112
  • Passport Expiry Date: 12/17/25
  • Date of Birth: 01/17/87
  • Nationality: Indian

Languages

  • English
  • Russian
  • Hindi

Languages

Hindi
First Language
English
Proficient (C2)
C2
Russian
Advanced (C1)
C1

Timeline

Senior Project Construction Engineer

Velesstroy’OOO’
10.2023 - Current

Senior Project Engineer

Renaissance Heavy industries
06.2021 - 10.2023

Senior Mechanical Engineer

Renaissance Heavy industries
03.2019 - 04.2021

Senior Tank Engineer

Punj Lloyd SND BHD
11.2016 - 10.2018

QA/QC PIPING & WELDING INSPECTOR

GS Neotek
11.2016 - 10.2018

Lead Mechanical & Piping QA/QC INSPECTOR

GS Neotek
11.2013 - 04.2014

Bachelor of Engineering - Mechanical Engineering

Mumbai University
Imran Ansari