Seek to work in an environment that will challenge me further,while allowing me to contribute to the continued growth and success of the organization. Obtain a position that will provide me the ability to apply my planning and work experience to a growing industry. look forward to working with a company that promotes quality products and services, and provides me with the opportunity to meet and exceed assigned planning goals.
Overview
12
12
years of professional experience
Work History
Site Engineer (QA/QC)
Kuwait Portland Cement Company
12.2019 - Current
Responsible for ensuring all utilities are coordinated to meet program deadlines, estimation of Quantity, Checking & Briefing of Staff.
Conducting trials of Mix designs proposed by clients As per ACI guidelines
Acquiring Approvals of mix Designs from Ministry of public works (MPW) for upcoming projects.
Sending Materials for testing for Approval from MPW by following specifications & guidelines as per ASTM & BS.
Maintaining & Documenting the reports of data gathered from Compressive strength test by crushed cube samples of projects.
Site visits for queries raised by clients or for their some customized requirements.
Conducting Rebound hammer test sometimes as per clients request.
Documentation of reports from data gathered by daily quality control test conducted in our Lab.
Documentation of Monthly & annual Production report.
Conducting Monthly & Annual Inventory of stocks.
Preparing reconciliation and consumption report for monthly and annual production and stock of materials.
Preparing applications to ministries for each semester calibration dates for ready-mix concrete plants and CTM ,and attending ministry personnel & engineers on the day of calibration.
Gathering & filing documents of staff & drivers required for application of permits & gate-passes for projects.
Mentoring and supervising junior staff. Site Management, Coordination with Staff and Consultant as per Requirement.
Pre planning and scheduling for upcoming tasks for projects.
Conducting comprehensive quality assurance checks, ensuring all work met or exceeded project standards.
Overseeing quality control processes by conducting regular inspections, addressing non-compliance issues promptly, and implementing corrective actions to uphold project standards consistently.
Creating work schedules and adjusting as needed to meet project deadlines and keep shifts properly staffed.
Managing on-site resources effectively, including personnel allocation, equipment utilization, and material storage to ensure smooth project progression with minimal downtime.
Reducing material waste through accurate estimation, procurement, and usage tracking of required resources.
Enhancing site safety by conducting regular inspections and enforcing strict adherence to safety protocols.
Site Engineer
B.K. Constructions PVT. LTD.
05.2018 - 11.2019
Site Management, Coordination with Staff and Consultant as per Drawing.
Pre planning and scheduling for upcoming tasks for projects. Verification with consultants for Workable Approved Drawings.
Implementation of All approved drawings. Trouble shooting delaying anomalies and Factors.
Rectifying and recover a hindrance if any.
Creating and cross-Checking bar bending Schedule.
Site Engineer
MOONSHINE REALTORS PVT LTD
01.2014 - 02.2016
Managed on-site resources effectively, including personnel allocation, equipment utilization, and material storage to ensure smooth project progression with minimal downtime.
Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.
Troubleshot on-site issues promptly using analytical problem-solving skills resulting in minimal delays to the overall schedule.
Delivered projects on time and within budget constraints by effectively managing resources, schedules, and risks.
Reviewed calculations and analytical data to maintain accuracy of technical reports.
Led team in construction of major infrastructure project, ensuring compliance with all technical specifications and regulations.
Site Engineer
ZAARA HOMES
07.2013 - 01.2014
Reduced material waste through accurate estimation, procurement, and usage tracking of required resources.
Troubleshot on-site issues promptly using analytical problem-solving skills resulting in minimal delays to the overall schedule.
Ensured high-quality standards were maintained throughout the project lifecycle by adhering to industry best practices and codes of conduct.
Delivered projects on time and within budget constraints by effectively managing resources, schedules, and risks.
Conducted comprehensive quality assurance checks, ensuring all work met or exceeded project standards.
Education
Bachelor of Engineering - Civil Engineering
North Maharashtra University
Jalgaon
07-2013
Skills
AutoCAD design software
Bar Bending Schedule
Quantity surveying & Valuation
Specialized in ready-mix concrete
Experienced in project management methodologies
Vendor relationship management
Microsoft office
Quality assurance
Site operations logistics planning
Proficient in scheduling
Efficient procurement management
Languages
English
Arabic
Hindi
Urdu
Gujrati
Marathi
Affiliations
CIVIL ENGINEER (Kuwait Society of Engineers Approved)
Timeline
Site Engineer (QA/QC)
Kuwait Portland Cement Company
12.2019 - Current
Site Engineer
B.K. Constructions PVT. LTD.
05.2018 - 11.2019
Site Engineer
MOONSHINE REALTORS PVT LTD
01.2014 - 02.2016
Site Engineer
ZAARA HOMES
07.2013 - 01.2014
Bachelor of Engineering - Civil Engineering
North Maharashtra University
Similar Profiles
Trevor MutisyaTrevor Mutisya
Trainee Engineer at East African Portland Cement CompanyTrainee Engineer at East African Portland Cement Company