Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Additional Information
Timeline
Hi, I’m

Mostafa Hamada

Project Engineer
Fintas
Mostafa Hamada

Summary

Self-Motivated and Goal-Oriented Mechanical Engineer, Certified PMP and MBA Holder with 9 Years Experience dedicated to Coordination, Construction and Planning for Oil&Gas Projects.

Always I am seeking to secure a Position with a Large and Reputable Organization in a Stable Environment that Would Lead to a Lasting Professional Relationship. In Addition, Enable Me to Utilize My Strong Organizational & Managerial Skills, Educational Background and Ability to Work Well with Colleagues & Clients.

Overview

9
years of professional experience
6
years of post-secondary education
12
Certifications
2
Languages

Work History

MECC/KOC

Project Engineer Mechanical
05.2018 - Current

Job overview

· Successfully completed the Construction of Water Injection Wells project, meeting all project objectives and exceeding client expectations.

· Maintains project schedule by monitoring project progress, coordinating activities, and resolving problems.

· Implemented a new resource management system that resulted in an increase in project efficiency.

· Coordinated with the KOC Team to overcome project challenges and complete the project ahead of schedule.

· Supervise the day-to-day implementation of Construction Activities.

· Prepare project proposals, schedules, and budgets, and provide feedback on design and specifications.

· Monitor compliance with codes, QA/QC policies, performance standards, and specifications.

· Maintain the project progress reports and ensured all procedures and documents were submitted for review and approval.

· Coordinated with KOC Team to achieve project targets and ensured work was performed according to plan and specifications.

· Study all the Drawings for HPS Hub Piping Work for Gc-4 and Gc-8.

· Work in Construction of HPS Hub Piping Work for Gc-4 and Gc-8 ((14", 12", 10", 8", 6" )) and all Associated works for Injector Wells.

· Controls project plan by reviewing design, specifications, and plan, scheduling changes, and recommending actions.

· Monitor all the HDPE Liner Activities.

· Determines project responsibilities by identifying project phases and elements, assigning personnel to phases and elements, and reviewing bids from sub-contractors.

· Develops project objectives by reviewing project proposals and plans and conferring with management.

· Working in Construction of Piping, Flow Line Work and Water Injection Wells.

· Completes technical studies and prepares cost estimates.

· Surveying and Follow Up Work Progress.

· Contributes to team effort by accomplishing related results as needed.

· Study Tender Documents, Projects Specification and BOQ.

· Prepares project status reports by collecting, analyzing, and summarizing information and trends; recommending actions.

  • Conducted research to test and analyze feasibility, design, operation and performance of equipment, components, and systems.
  • Communicated project requirements and areas for improvement in design review meetings.

HEISCO

Project Engineer Mechanical
01.2018 - 05.2018

Job overview

  • Successfully completed the Mechanical, Painting and Insulation Works project within the designated timeframe and budget
  • Improved the efficiency of project planning and scheduling by implementing a new system, resulting in a reduction in project completion time
  • Coordinated with subcontractors to ensure smooth and efficient project execution
  • Maintained a high level of commitment to HSE and QC procedures
  • Supervise the Site Activities
  • Monitor and Track design, Procurement & Construction Activities
  • Responsible for TCF Plan and Layout
  • Prepare the Project Budget
  • Prepare the manpower histogram and cost estimation for various projects, tenders and proposals works with all involved disciplines and preparation of schedules.

HEISCO/KOC

Site Engineer Mechanical
03.2016 - 01.2018

Job overview

  • Successfully completed the Construction of Flow Line & Associated Works project, meeting all project objectives and exceeding client expectations
  • Resolved problems encountered during construction, ensuring project completion within the designated timeframe and budget
  • Participate in Managing the resources effectively, ensuring efficient utilization of manpower, equipment, and materials
  • Participate in Surveying and Follow Up Work Progress
  • Monitor in Procurement and Construction Activities
  • Contribute In Prepare Action Plans for Forecasted Work through the Project
  • Monitor and Track design, Procurement and Construction activities
  • Co-operating with various teams (Drilling, Field Development, and Production Operation) to accumulate the Flow line data and prepare a comprehensive analysis for all future requirements.

Al Shura Steel, TITAN Cement Site

Maintenance Mechanical Engineer
12.2015 - 03.2016

Job overview

  • Developing and implementing maintenance plans, resulting in a reduction in equipment downtime
  • Effectively monitoring and tracking design, procurement, and maintenance activities
  • Made plans for shutdowns and maintenance, ensuring minimal downtime and efficient project execution
  • Monitoring and controlling the Accumulative Progress According to the Plan and Actual Schedule.

Metrology Engineering and Calibration Center

Mechanical Engineer
12.2014 - 12.2015

Job overview

  • Designing Maintenance Strategies, procedures and methods
  • Carrying out routine scheduled maintenance work and responding to Valves faults
  • Monitoring and controlling maintenance costs
  • Dealing with emergencies, unplanned problems and repairs.

Education

Brooklyn Business School (Brooklyn Institute)

MBA
09.2020 - 05.2022

Alexandria University

Bachelor of Science from Mechanical Engineering
09.2009 - 06.2014

Project Management Institute (PMI).

Certified Project Management Professional (PMP)

Egyptian Engineers Syndicate

Certified Primavera P6 V8.4 From Egyptian Engineers Syndicate.

Skills

    Scheduling

Budgeting

Metal fabrication

Bill of Material (BOM)

Project Management

Feasibility review

Staff Management

Mechanical engineering

Accomplishments

    1. Approved as a Project Engineer from M/S Saipem for (NRP-4 Al Zour Refinery Project).

    2. Approved as a Mechanical Construction Engineer from (S&EK) KOC Project Management in Contract No. 17051799.

    3. Approved as a Site Engineer Mechanical from West Kuwait KOC Project Management in Contract No. 13050881.

    4. Appreciation Received from KOC against Effort done in the Following Works:

    - The Successful Hand over of Injector and Producer Wells beyond the rate of construction specified in the contract for the month of Feb-2020 (Total-48 Wells).

    - Quick Response, Prompt Action and Early Completion for Handing over Injector and Producer well for (PAD-729).

    - The Early completion of New HPS HUB Piping System at GC-4 and GC-8 Including the Flow Lines, Hook-Up, Tie-In and Associated Works.

    - Quick Response, Prompt Action and Early Completion for Repair and Rectify the Water Leak from Rupture Pipe at MN-172 RTP Disposal line to header at EPF-18.

    - Quick Response, Prompt Action and Early Completion for Unplanned Shutdown of MCO Work for GC-27.

Certification

Project management.

Additional Information

  • Date of Birth: February 16, 1992.
  • Marital Status: Married.
  • Driving License Valid Egypt and Kuwait.

Timeline

Brooklyn Business School (Brooklyn Institute)

MBA
09.2020 - 05.2022

Project Engineer Mechanical

MECC/KOC
05.2018 - Current

Project Engineer Mechanical

HEISCO
01.2018 - 05.2018

Site Engineer Mechanical

HEISCO/KOC
03.2016 - 01.2018

Maintenance Mechanical Engineer

Al Shura Steel, TITAN Cement Site
12.2015 - 03.2016

Mechanical Engineer

Metrology Engineering and Calibration Center
12.2014 - 12.2015

Alexandria University

Bachelor of Science from Mechanical Engineering
09.2009 - 06.2014

Project Management Institute (PMI).

Certified Project Management Professional (PMP)

Egyptian Engineers Syndicate

Certified Primavera P6 V8.4 From Egyptian Engineers Syndicate.
Mostafa HamadaProject Engineer