Self-Motivated and Goal-Oriented Mechanical Engineer, Certified PMP and MBA Holder with 9 Years Experience dedicated to Coordination, Construction and Planning for Oil&Gas Projects.
Always I am seeking to secure a Position with a Large and Reputable Organization in a Stable Environment that Would Lead to a Lasting Professional Relationship. In Addition, Enable Me to Utilize My Strong Organizational & Managerial Skills, Educational Background and Ability to Work Well with Colleagues & Clients.
· Successfully completed the Construction of Water Injection Wells project, meeting all project objectives and exceeding client expectations.
· Maintains project schedule by monitoring project progress, coordinating activities, and resolving problems.
· Implemented a new resource management system that resulted in an increase in project efficiency.
· Coordinated with the KOC Team to overcome project challenges and complete the project ahead of schedule.
· Supervise the day-to-day implementation of Construction Activities.
· Prepare project proposals, schedules, and budgets, and provide feedback on design and specifications.
· Monitor compliance with codes, QA/QC policies, performance standards, and specifications.
· Maintain the project progress reports and ensured all procedures and documents were submitted for review and approval.
· Coordinated with KOC Team to achieve project targets and ensured work was performed according to plan and specifications.
· Study all the Drawings for HPS Hub Piping Work for Gc-4 and Gc-8.
· Work in Construction of HPS Hub Piping Work for Gc-4 and Gc-8 ((14", 12", 10", 8", 6" )) and all Associated works for Injector Wells.
· Controls project plan by reviewing design, specifications, and plan, scheduling changes, and recommending actions.
· Monitor all the HDPE Liner Activities.
· Determines project responsibilities by identifying project phases and elements, assigning personnel to phases and elements, and reviewing bids from sub-contractors.
· Develops project objectives by reviewing project proposals and plans and conferring with management.
· Working in Construction of Piping, Flow Line Work and Water Injection Wells.
· Completes technical studies and prepares cost estimates.
· Surveying and Follow Up Work Progress.
· Contributes to team effort by accomplishing related results as needed.
· Study Tender Documents, Projects Specification and BOQ.
· Prepares project status reports by collecting, analyzing, and summarizing information and trends; recommending actions.
Scheduling
1. Approved as a Project Engineer from M/S Saipem for (NRP-4 Al Zour Refinery Project).
2. Approved as a Mechanical Construction Engineer from (S&EK) KOC Project Management in Contract No. 17051799.
3. Approved as a Site Engineer Mechanical from West Kuwait KOC Project Management in Contract No. 13050881.
4. Appreciation Received from KOC against Effort done in the Following Works:
- The Successful Hand over of Injector and Producer Wells beyond the rate of construction specified in the contract for the month of Feb-2020 (Total-48 Wells).
- Quick Response, Prompt Action and Early Completion for Handing over Injector and Producer well for (PAD-729).
- The Early completion of New HPS HUB Piping System at GC-4 and GC-8 Including the Flow Lines, Hook-Up, Tie-In and Associated Works.
- Quick Response, Prompt Action and Early Completion for Repair and Rectify the Water Leak from Rupture Pipe at MN-172 RTP Disposal line to header at EPF-18.
- Quick Response, Prompt Action and Early Completion for Unplanned Shutdown of MCO Work for GC-27.