Proficient in ETAP and operating systems such as Windows, with a strong foundation in C programming. Demonstrates working knowledge of Microsoft Office Suite, including Excel, Word, PowerPoint, and Spreadsheet applications. Committed to leveraging technical skills to drive efficiency and innovation in future roles.

Knowledgeable electrical professional and analytical problem-solver with deep knowledge of electrical principles, equipment and systems. Focused on balancing quality, safety and performance.

Astute electrical engineering professional with extensive design and development experience. Skilled in technical consultancy to build, manage and maintain robust power systems. Coordinates technical and non-technical teams to create strategic product and process solutions.

Experienced in electrical design with focus on creating innovative and reliable solutions for various engineering projects. Skilled in utilising advanced CAD software and electrical schematics to streamline design processes and ensure compliance with industry standards. Committed to enhancing project efficiency and delivering high-quality, cost-effective designs.

Overview

2027
2027
years of professional experience
2
2
years of post-secondary education

Work history

Electrical Design Engineer

Kuwait Oil Company (KOC)
Al Ahmadi, Kuwait
2010.08 - Current
  • Prepared feed packages based on SG 3.1 and SG 4.0 reviews to ensure project compliance.
  • Perform feed calculations manually and validate results using ETAP studies.
  • Run load flow, short-circuit, and motor starting studies within ETAP.
  • Coordinate relay settings, motor starting checks, and arc-flash studies in ETAP.
  • Conduct second and peer reviews for technical electrical packages.
  • Contribute technical input during tender package preparation for oil and gas work.
  • Support bid evaluation and provide technical recommendations before contract award.
  • Reviewed and approved electrical drawings and documents, ensuring adherence to project specifications and industry standards.
  • Review contractor claims and perform technical verification for approval decisions.
  • Participate as permanent TFT member in standard committee for revisions and new standards.
  • Attend factory acceptance tests for procured electrical equipment to confirm readiness.
  • Design electrical systems complying with industry standards across multiple project types.
  • Draft electrical specifications and define special test procedures for installation and commissioning.
  • Delivered technical training to new engineers, enhancing their capabilities and contributing to overall team expertise.

Senior Electrical Design and Project Execution Engineer

Al Khadda International company
2007.04 - 2010.08
  • Executing L.P gas pipe line up gradation project in side KOC in GCs # 02,09,19,20&22, Improvement of ESDV system in GC-17,27 & 28, 24” H.P Gas system to Shuaiba north Power station and L.P Gas pipe line from Magwa M/F to Shuwaikh power station.
  • This includes Designing of Electrical Installations and drawings preparation/reviewing.
  • Material Procurement and Inspection.
  • Supervision of Electrical, Instrumentation & Cathodic protection works as per KOC/IEC standard.
  • Technical evaluation of system vendors for Aquatic Leak Detection System & Partial Stroke Testing system, DCS and ESDV systems.
  • Tendering and Estimation of Electrical, Instrumentation, C.P and F&G for new projects.

Electrical Maintenance Engineer

Shuiba Refinery Kuwait National Petroleum Company
2001.11 - 2007.02
  • Carrying out the following Activities in Maintence, Preventive Maintence and Predictive Maintence of Electrical Equipments like HT & LT motors, Transformers, HT switchgears, HT circuit Breakers, MCCs, CP Systems and Earthing systems etc.
  • Predictive and Preventive maintence of both HT and LT motors.
  • Maintence of Transformers 1200 KVA, 6.6KV/440 volt.
  • Maintence of HT switch Gear.
  • Maintence of HT circuit Breakers (MOCB and VCB).
  • Maintence of MCC.
  • Cabling and Termination.
  • Maintence of Generators up to 1200 KVA.
  • Monitoring and maintence of CP system.
  • Maintence of UPS, Battery Bank and installation and commissioning of the same.
  • Well versed with relevant NEC, IEC, IEEE, IS and KNPC standards and specifications.
  • Carrying out in house projects like H.T switch gear replacement, MCC replacement, Installation & commissioning of transformers (1200KVA, 6.6/.440KV), Cable replacement, Lighting, Earthing etc. as per drawing and following KNPC standard.
  • Preparation of Equipment Failure, Investigation Reports and monthly Reports.
  • Member of RCA (Route Cause Analysis) team.

Senior Engineer (Design)

BHPE Kinhill, Browen and Root Asia Pasific
Paradip Port
2000.06 - 2001.10
  • Designing and executing a Mechanized coal handling project.
  • Short circuit calculation.
  • Designing of Distribution Network (33 KV, 6.6 KV and 440 volt).
  • 132/33KV, 33/6.6 KV Sub-stations (mainly having 2x40 MVA & 2x20 MVA and 6x5 MVA Transformers).
  • 132 KV switchyard. (Indoor).
  • 20 Km long Conveyor Belting & related Equipments.
  • Preparation of Equipment data sheet as per area classification.
  • H.T & L.T Motors testing and commissioning.

Senior Engineer (Electrical Design & Project Execution)

Engineers India Limited (EIL)
Visakhapatnam
1997.06 - 2000.05
  • Visakha Refinery 3mmtc Expansion Project (PHASE-II) D.H.D.S Project in Visakhapatnam.
  • Leading a team for the execution of Electrical Jobs in VERP-II which involved Verification and approval of cable sizing, grounding system etc as per site cond.
  • Short Circuit Calculation, Ear thing Calculation etc.
  • Preparation of Final Cable Schedule, Preparation of as built drawing.
  • Extension, Modification, Testing and Commissioning of sub-Station.
  • Testing and Commissioning of 33 KV Sub-Station.
  • Testing and Troubleshooting of different grade breakers viz. 33 KV, 11 KV, 3.3 KV and LT.
  • Testing and commissioning of Electrical protection system.
  • Testing and commissioning of 11 KV, 3.3KV and LT switchgears and H.T. Motors (Max 3.3 MW of 3.3. KV grade).
  • Testing and commissioning of UPS, Public Address System, Fire Alarm System.
  • Autotransformer and Annunciation System of the Refinery.
  • Partly involved in a similar type of job in prestigious DHDS project in VISAKHA REFINERY.
  • SPECIAL ASSIGNMENTS: Deputed by EIL to execute Electrical works at Gas Authority of India (Gail’s) KHERA COMPRESSOR STATION.
  • Gas Compressor Station for HBJ pipe line at KHERA.
  • To help a team of Electrical Engineers in Commissioning of 2 MVA Sub-Station All Electrical Equipment related with Compressor Station.

Electrical Engineer (DESIGN & EXECUCATION)

Sterling Holiday Resorts (I) Limited
1995.01 - 1997.03
  • Designing and execution of Electrical Installations like Distribution network system.
  • Grounding system and grounding network.
  • Transformers of capacities 5MVA & 2MVA , 33/.440 KV 33 Kava Sub station.
  • Switch Gears of 33KV(HT) and 415 V(LT).
  • Breakers H.T.C.B (VCB,SF6)15 V(LT).
  • Construction of one of the biggest resorts of India with all modern Equipments.
  • Designing, Erection, testing and commissioning of one 33 KV Sub-Station.
  • Cabling for all power distributions.
  • Commissioning of Electrical Motors and Panels in Offsite. Commissioning of EPABX System.

MAINTENANCE ENGINEER

Center for Youth and Social Development (CYSD)
Bhubaneswar
  • Responsible for carrying out Electrical maintenance of a 11/0.433 KV Sub-Station.

WORKS ENGINEER

ALFA TRANSFORMER
, India
  • Manufactures Transformers up to 10 MVA Capacity.
  • Responsible for the execution of works as per design data, at different sections viz Core cutting and Assembling.
  • H.T., L.T. Winding and Transformers assembling.
  • Oil Filtration Plant.
  • Testing.

Education

Fellow - Electrical Engineering

Institution Of Engineers (India)
India

Master of Technology - Power System

Punjab Technical University
India
2007.05 - 2009.06

Bachelor of Engineering - Electrical

Institute of Engineers (India)
Kolkata, India

Intermediate in Science - Physics, Chemistry, Mathematics

Utkal University
India

H.S.C. Examination - Mathematics (Opt), G.Sc., English, Sans.

B.S.E.
Orissa, India

Skills

  • ETAP
  • OPERATING SYSTEMS: Windows
  • LANGUAGES: C
  • Working Knowledge: MS Office, Excell, Word, Power Point and Spreadsheet

Languages Known

English
Fluent
HINDI
Fluent
ODIA
Native

Training Undergone

  • ETAP (Electrical Transient Analyzer Program), trained and carrying out Power System Studies for the projects using latest ETAP Software.
  • Awarded with a certificate for attending a course on GROUNDING SYSTEM in Kuwait University.
  • Undergone NACE level 2 course for C.P system.
  • Attended a workshop on BPL's, EPABX and Telephone at Chennai, India.

Timeline

Electrical Design Engineer

Kuwait Oil Company (KOC)
2010.08 - Current

Master of Technology - Power System

Punjab Technical University
2007.05 - 2009.06

Senior Electrical Design and Project Execution Engineer

Al Khadda International company
2007.04 - 2010.08

Electrical Maintenance Engineer

Shuiba Refinery Kuwait National Petroleum Company
2001.11 - 2007.02

Senior Engineer (Design)

BHPE Kinhill, Browen and Root Asia Pasific
2000.06 - 2001.10

Senior Engineer (Electrical Design & Project Execution)

Engineers India Limited (EIL)
1997.06 - 2000.05

Electrical Engineer (DESIGN & EXECUCATION)

Sterling Holiday Resorts (I) Limited
1995.01 - 1997.03

MAINTENANCE ENGINEER

Center for Youth and Social Development (CYSD)

Bachelor of Engineering - Electrical

Institute of Engineers (India)

Intermediate in Science - Physics, Chemistry, Mathematics

Utkal University

H.S.C. Examination - Mathematics (Opt), G.Sc., English, Sans.

B.S.E.

WORKS ENGINEER

ALFA TRANSFORMER

Fellow - Electrical Engineering

Institution Of Engineers (India)
PRAVANJAN MOHANTY