Summary
Overview
Work History
Education
Skills
Accomplishments
Software
Certification
Timeline
Manager
Sai Kumar Sairoopan

Sai Kumar Sairoopan

Senior ELV Engineer
Kuwait

Summary

Competent Engineering professional offering foundation in engineering project management and design. History of success in performing load and cost calculations and establishing clear parameters. Detail-oriented with strong knowledge of [Area of expertise] and [Software]. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills. Detail-oriented, organized and meticulous employee. Works at fast pace to meet tight deadlines. Enthusiastic team player ready to contribute to company success.

Overview

18
18
years of professional experience
7
7
years of post-secondary education
3
3
Certifications
7
7
Languages

Work History

Senior ELV Engineer

Tamdeen Group
Kuwait
05.2018 - Current
  • Conducted research to test and analyze feasibility, design, operation and performance of equipment, components, and systems.
  • Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.
  • Routed and integrated technical and electrical components for projects.
  • Prepared action plans for problematic processes and assets.
  • Tested and analyzed equipment design and performance feasibility to determine potential ROI.
  • Conducted feasibility studies for proposed projects using potential ROI and risk management.
  • Illustrated potential obstacles when conducting site assessments for planned projects.
  • Developed cost estimates and project specifications for proposals.
  • Trained and mentored competent and flexible workforce to meet project needs and promote positive work environment.
  • Resolved architecture, design or verification problems by applying sound ASIC engineering practices.
  • Performed preventative maintenance to keep tools and equipment functional.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Developed work plans for various personnel roles based on strengths and talents.
  • Interacted with subject matter experts to develop training material and tools for personnel.
  • Provided input to team lead regarding areas for process and procedural improvement.
  • Wrote, reviewed and edited technical document in accordance with template requirements.
  • Participated in formal internal design reviews of proposed products and components.
  • Developed positive working relationships with stakeholders to effectively coordinate work activities.
  • Interpreted blueprints and technical drawings to analyze upcoming projects.

Electrical Site Engineer

HEISCO
Kuwait
12.2011 - 05.2018
  • Verified on-time deliverables within budget parameters through effective management of project milestones.
  • Coordinated material delivery and organisations to maintain a smooth flow of work.
  • Oversaw teams of electrical contractors focused on installing [high, medium, and low voltage type] systems for Large Oil & gas projects at Kuwait Oil Company, Kuwait National Petroleum Company, Kuwait Oil Tanker Company, and in-house HEISCO Projects.
  • Read and interpreted blueprints, diagrams, and schematics to correctly coordinate work.
  • Negotiated schedules, work plans and payment structures with subcontractors.
  • Checked work quality and compliance with design specifications.
  • Provided on-site engineering and technical services during installation and fielding processes.
  • Leveraged mastery of AutoCAD Electrical Toolset to develop and document electrical schematics.
  • Read and analyzed blueprints and project documentation to develop workflows and strategy.
  • Developed engineering documentation detailing system requirements and diagnostic procedures.
  • Estimated project costs and resource allocation to forecast budget requirements and monitor adherence.
  • Mentored junior engineers and new hires in job-specific tasks and application of electrical processes.
  • Identified specific cables, fuses and circuit breakers required for assigned installations.
  • Reduced electrical construction hazards with upgraded safety policies and stringent enforcement.
  • Supervised construction and pre-commissioning of electrical rooms and substations.
  • Evaluated electrical installations and systems to isolate faults and implement corrective actions.
  • Inspected completed installations to observe operations and verify conformance to design and equipment specifications.

Software Engineer

Accenture
Bangalore
01.2010 - 11.2011
  • Coordinated with other engineers to evaluate and improve software and hardware interfaces.
  • Worked with software development and testing team members to design and develop robust solutions to meet client requirements for functionality, scalability, and performance.
  • Reviewed project specifications and designed technology solutions that met or exceeded performance expectations.
  • Analyzed proposed technical solutions based on customer requirements.
  • Analyzed data to coordinate installation of new systems or modification of existing systems.
  • Conducted regression testing and submitted observations to development team.
  • Coordinated efficient large-scale software deployments.
  • Collaborated with clients to define solution requirements.
  • Provided direction and guidance to process improvements and established policies.
  • Worked with customers for needs analysis and to determine vendor costs.
  • Participated in architecture, design and implementation of back-end features using C++, C#, Oracle, SQL Server, UNIX, Microsoft Sharepoint
  • Represented software applications engineering team during large and complex development projects.
  • Designed enhancements and updates for subsystems of end-user applications software running on local, networked and Internet-based platforms.
  • Updated old code bases to modern development standards, improving functionality.
  • Collaborated with management, internal and development partners regarding software application design status and project progress.
  • Tested methodology with writing and execution of test plans, debugging and testing scripts and tools.

Apprentice Electrician / Junior Project Engineer

Perfetti Van Melle India Pvt
Chennai
06.2005 - 06.2006
  • Checked and performed electrical wiring through conduits and holes in walls and floors.
  • Tested continuity of circuits using test equipment to verify compatibility and safety of systems following installation, replacement, or repair.
  • Pulled wire through conduits and through holes in walls and floors.
  • Organized materials and tools in to maintain clean and neat work areas.
  • Understood and used proper tools and equipment to install and maintain electrical systems.
  • Followed all safety procedures and guidelines to promote safety while working on electrical systems.
  • Connected wires to circuit breakers, transformers and other components to create working electrical systems.
  • Learned and followed latest electrical codes and regulations to deliver compliant electrical systems.
  • Inspected electrical systems, equipment and components to identify hazards and defects.
  • Installed safety and distribution components for electrical systems, such as switches, resistors and circuit-breaker panels.
  • Spliced, joined and connected wire to fixtures and other electrical components.
  • Tested electrical systems functionality and continuity of circuits using devices such as ohmmeters, voltmeters and oscilloscopes.
  • Studied building schematics to determine location of wiring and equipment.
  • Troubleshot and repaired malfunctioning systems and components.
  • Interpreted drawings, wiring diagrams, flow charts and written descriptions of project requirements.
  • Prevented breakdown of systems by routinely inspecting and replacing old wiring and cleaning circuits.
  • Inspected electrical systems, equipment and components to identify hazards, defects and need for adjustment or repair.
  • Replaced and repaired lighting fixtures and electrical control and distribution equipment.
  • Examined electrical units for loose connections and broken insulation.
  • Consulted with management on functionality and lifespan of electrical equipment, advising when continued use may be hazardous.
  • Repaired or replaced wiring, equipment and fixtures using hand tools and power tools.
  • Read and interpreted blueprints and electrical schematics to determine layout of electrical systems.
  • Completed full apprenticeship program to become qualified Electrician.
  • Read and interpreted drawings to provide wiring layouts for new installations
  • Identified and studied electrical problems to determine correct solutions.

Education

Bachelor of Technology - Electrical And Electronics Engineering

SRM UNIVERSITY
Chennai.
06.2006 - 05.2009

Diploma in Electrical And Electronics Engineering - Electrical And Electronics Engineering

Adhiparasakthi Polytechnic College
Tamil Nadu
06.2002 - 05.2006

Skills

Electrical engineering

undefined

Accomplishments

  • Used Microsoft Excel to develop inventory tracking spreadsheets.
  • Resolved product issue through consumer testing.
  • Documented and resolved [Issue] which led to [Results].
  • Mentored and directed [Number] team members on a large scale electrical installation project for a theater and performance facility.
  • Collaborated with team of [Number] in the development of [Project name].
  • Mentored [Number] new employees to bring them up to speed on projects, resulting in quicker overall completion milestones.
  • Provided extensive documentation on apps to clients outlining all aspects of the implemented updates and changes, resulting in a [Number]% reduction in client support calls.
  • Achieved [Result] by completing [Task] with accuracy and efficiency.
  • Resolved existing performance issues in the database which optimized the system [Number]%.

Software

Microsoft Office

S&B Parking Management

Q-Free Parking Guidance

Orbility Parking Management

Milestone VMS

ICETANA Analytics

VDG VMS

QSC Audio

Nova star

LED Vision

Navori systems

ONELAN Systems

SCAALA Systems

Certification

Licensed [Job Title] - [Timeframe]

Timeline

Senior ELV Engineer

Tamdeen Group
05.2018 - Current

Electrical Site Engineer

HEISCO
12.2011 - 05.2018

Software Engineer

Accenture
01.2010 - 11.2011

Bachelor of Technology - Electrical And Electronics Engineering

SRM UNIVERSITY
06.2006 - 05.2009

Apprentice Electrician / Junior Project Engineer

Perfetti Van Melle India Pvt
06.2005 - 06.2006

Diploma in Electrical And Electronics Engineering - Electrical And Electronics Engineering

Adhiparasakthi Polytechnic College
06.2002 - 05.2006
Sai Kumar SairoopanSenior ELV Engineer