Talented Manager with 27 years of experience working in the construction industry and infrastructure,
expert team leadership, planning and organizational skills built during successful career. Smoothly equip employees to independently handle daily functions and meet customer needs. Diligent trainer and mentor with exceptional management abilities and results-driven approach.
Projects budget around 30 million kd, for many precast projects which including all type of precast elements such as double tee slabs (TT slab), hollow core slab (HC slab), prestressed beams, precast beams, precast columns, cladding, barriers, …
· Control all the project activities, from submittal of subcontractors, materials, shop drawings, and supervising procurements materials, progress at the project, monitored construction progress, updating documents and information. & Checking up to handing over the project and closing status of financial and technical. to be performed & “Established,
Tunneling division - South Al-Mutla Housing project construction, completion and Maintenance of the Main Roads Works and Infrastructure, contract no. (PAHW/C/1279-2016/2017)
Project budget 15,000,000 KD, 40km micro tunneling project.
· Project manager for Al-Mutla city project for micro tunneling activities, mange all the work activities, arrange all resources for site, following up the avn progress, finished 40 km by Herrenkencht AVN form dia. 400mm to 2000 mm.
Manager for tunneling divisions in fully responsible for managing the execution of micro tunneling works using MTBM machines, sites requirements operation and maintenance the tunneling machines of diameters 600,800,1000mm,1200mm &1400mm from Herrrenknecht Company, Germany.
1. Supervise and prepare of necessary Studies for new tenders including pricing, time scheduling and method of statement.
2. Prepare the sub-contractor’s agreements and reviewed sub-contractor’s monthly invoices and prepare sub-contractors payment certificates.
3. Project manager for infrastructure project
4. Project manager for precast projects
· Projects with High Slant Contracting Group: -
1- Sabah Al Ahmed City Infrastructure Works. Contract no. 1119
Owner & consultant: - Public Authority for Housing Welfare
Main Contractor: - Al Hagraf Contracting & Trading Co. K.C.S.C
Activities description: - sewage pipe line by AVN800, 1000, 1200, 1400.
1- Jaber Al Ahmed City Infrastructure Works. Contract no. 1137-2009/2010
Owner & consultant: - Public Authority for Housing Welfare
Main Contractor: - Al Ahmadiah Contracting & Trading Co. K.C.S.C
Activities description: - sewage pipe line by AVN800, 1000, 1200.
2- ROADS, STORMWATER DRAINS, SANITARY SEWERS, & OTHER SERVICES Contract no. RA/165.
Owner & consultant: - Ministry Of Public Works
Main Contractor: - Medco Contracting & Trading Co.
Activities description: - Sewage pipe line by AVN400, 600.
4- Construction, Operation and Maintenance of TSE network and Reservoirs for Project Area –C1, Contract no. SE/80
Owner & consultant: - Ministry of Public Works.
Main Contractor: - Mushrif Contracting & Trading Co.
Activities description: - Sleeves steel for treatment water pipe line by AVN600,1200,1600.
5- Construction of "The Avenues-Phase III" project, External Infrastructure Works.
Main Contractor: - Alganim International general Trading & Contracting Co.
Activities description: - storm water pipe line by AVN1000, 1200 mm
6- Construction and Maintenance of Roads, Bridges, drainage, Sewer and
Other Services for Completion of the First Ring Road – Jahra Gate
Roundabout (Package 1), Contract no. RA/106
Owner & consultant: - Ministry Of Public Works.
Main Contractor: - Aktor-Copri "Joint Venture.
Activities description: - storm water pipe line by AVN1000, 1200 mm.
7- Design, construction, Equipment, Furniture and Operation Maintenance for the New Al-Sabah Hospital.
Owner & consultant: - Ministry Of Health.
Project Management: - SPDM-SPDM INTL
Consultant: - Soor Engineering Bureau (SEB)
Main Contractor: - Shapoorji Pallonji middle east.
Activities description: - car park building, casting in situ for the raft and erects the precast element, columns, beams, double Tee, & hollow core and casting the topping.
8- New Al-Farwania Hospital (A/C 1170)
Owner & consultant: - Ministry of Health.
Consultant: - Soor Engineering Bureau
Main Contractor: - Sayed Hamid Behbehani & Sons Co. W.L.L.
Activities description: - car park building, erect the precast element, columns, beams,double Tee & hollow core
9- Construction and Maintenance the expansion of the new central market for the Al-Fintas Cooperative Society and developing the existing market and parking
Owner & consultant: - Ministry Of Affrais
Main Contractor: - High slant contracting co.
Activities description: - Infra structure work, storm water pipe lines and roads.
Managing the site requirements and operation and maintenance of the latest edition of the tunneling machines diameter of 1000mm, 1200mm, AVN from Herrrenknecht Company, Germany.
Project Engineer for water pipe line
- Project engineer for design the proposed alignment of line, prepare the shop drawings and setting out the route axis, executing site surveying activities.
- follow up the excavation and laying activities.
- follow up the construction of air valve, wash out and isolation valves manholes
- Execute the test pressure, washing and sterilization for pipe line.
- Supervise of micro tunneling work for water pipe line under main roads.
- Prepare the payment certificate for the project
- Full coordination with owner staff.
· Projects with KCCEC Engineering & Contracting Co. :-
1- Construction & execution the administration building for Kccec Engineering & Contracting Co. in Subhan area, the building area around 12,000m2, it consists of Basement, ground floor & 1st floor.
2- Sewage from Residential Area West of Jeleep AlShuyoukh connected to Sanitary Sewerage System, Contract No.SE/74
Owner & consultant: - Ministry Of Public Works.
Main Contractor: - Kuwait Arab Contractors Co.
Activities description: - Sewage pipe line by using micro tunneling machine AVN1000, 1200.
3- AZ ZOUR Water Distribution Scheme (Stage - II), D.I Pipelines North & South of Mina Abdullah Complex.
Owner & consultant; - Ministry of Electricity & Water
Main Contractor:- Kuwait Control Contracting & Engineering Co., KCCEC
Activities description:- 65 km fresh water pipe line by using ductile iron pipe, (excavation, laying, manholes, D.I jacking Pipes for construct the pipe line under main roads by using micro tunneling machine 1200mm.
Dec. - 2002
TO
Oct. - 2005
Operation Manager & operator for micro tunneling machines
· GLOBAL ENGINEERING SERVICES CO.-KUWAIT
- As a Micro tunneling operator for tunneling machines diameters of 400mm, up to 1400mm from Herrrenknecht company, Germany.
- Managing and Executing all site activities for two control cabins, arranging the materials from the local market, make planning for the equipment’s and mobilization of the units after the operations, setting up alignment, level, jack frame and laser for all machines diameters, maintenance of machines and trailing tube when the jacking is completed, keeping the drive records and daily report for all manner, making advance plans for the requirements of equipment’s without any delay of further operation.
· Projects with Global Engineering Services Co.-Kuwait:-
1- Kuwait sewerage renovation phase VII-Salwa.
· Owner & consultant: - Ministry Of Public Works.
· Main Contractor: - Burhan Kuwait Trading and Contracting Co.
· Activities description: - Sewage pipe line by using micro tunneling machine AVN400, 600,700,800.
2- A7 pumping station and tunnels, Contract no. SE/34.
· Owner & consultant: - Ministry Of Public Works.
· Main Contractor:- M.A Kharafi and sons w.l.l
· Activities description: - Sewage pipe line by using micro tunneling machine AVN400, 600,700,800.
3- Kuwait sewerage renovation-phase-VII-part C-Fahaheel, Contract no. SE/52.
· Owner & consultant:- Ministry Of Public Works.
· Main Contractor: - Combined Group Co."
· Activities description: - Sewage pipe line by using micro tunneling machine AVN400, 600.
4- Kuwait Sanitary sewer renovation-phase-IV,part B, Salmiya–Rumaythiya, contract no.SE/48
· Owner & consultant: - Ministry Of Public Works.
· Main Contractor:- M.A Kharafi and sons w.l.l"
· Activities description: - Sewage pipe line by using micro tunneling machine AVN600.
in microtunneling section as a site engineer leading and operating team for sinking shafts by open sinking method using pre-cast segments for launching and receiving slurry microtunneling machines, mobilization and setting up the microtunneling equipments, finishing shafts after jacking completed to be manholes.
- Operator for slurry microtunneling machines (AVN) of diameters 600mm, 700mm and 1000mm from Herrrenknecht Company, Germany.
· Projects with ARAB CONTRACTORS CO. (OSMAN AHMED OSMAN) – EGYPT
- Sewage Lines for Al-Marag area – Cairo (5km by AVN600)
- Reduction of underground water at Vestige area in ancient Cairo (4km by AVN600,700).
As a site engineer for sinking shafts by low pressure compressed air(LPCA) method and constructing launch and retrieval chambers for lovat earth pressure balanced machines ( EPB shields )
As a tunneling engineer in lovat tunnel boring machines (TPM) of internal diameters 1.86mt & 2.25mt, handling all work in site and checking alignments and levels of machines by surveying instruments.
As a microtunneling operator for micro tunneling machines of diameters 600mm & 1000mm from Herrrenknecht Company, Germany, do all activities for machine set up.
· Projects with CAIRO WASTEWATER CNSORTIUM (C.W.C.) - EGYPT
· Cairo projects by TBM diameters 1.86 and 2.25 mt (7 km).
· Cairo tunnels by micro tunneling machines AVN 600,700 and 1000mm, (8km).
Group Coordination & communication
undefinedResourceful Project Manager expertise in organizing micro tunneling projects' operations, construction projects, precast projects, fresh water pipe line and infrastructure projects, financial oversight, and resource management to achieve smooth flow and project operations. Leads procurement of resources, including equipment and supplies. Monitors projects by adhering to the production schedule and budget, managing the production team, identifying problems, and providing targeted solutions. Knowledgeable in accounting principles, bookkeeping, budget and financial management, From the start date of the project, submittal, approval, procurement, installation, testing, commissions, and closing handing over of the finish date
· Project management, negotiation, coordination, problems solving &alternative solutions skills.
· Managing the execution of micro tunneling works using MTBM, TBM machines, sites requirements and operation and maintenance the tunneling machines.
· Supervise and prepare of necessary Studies for new tenders including pricing, time scheduling and method of statement.