Results-driven project manager with focus on technical initiatives. Proven track record in leading cross-functional teams and ensuring project milestones are met. Adept at adapting to changing needs and fostering collaborative environment. Skilled in strategic planning, risk management, and stakeholder communication.
Overview
20
20
years of professional experience
Work History
Senior Technical Project Manager.
M/S. LARSEN & TOUBRO LIMITED, PT&D - Kuwait
04.2015 - Current
, Working as Senior Technical Project Manager for M/S. Larsen & Toubro Limited, PT&D – Kuwait for the following projects.
Contract No.: MEW/C/5960-2023/2024, Supply and Installation of (4) Nos 132/11kV Substation in Al Sabah Medical area. (MEW).
Contract No.: PAHW/C/1528-2023/2024, Supply, Installation, Implementation and Maintenance of (4) Nos 132/11kV Substation and (1) Nos 11/0.415kV Substation in the Service Axis of Jaber Al Ahmad city.(MEW/PAHW)
Contract No.: PAHW/C/1560-2024/2025, Supply, Installation, Implementation, and Maintenance of a main station with a voltage of 400/132/11 kV (4Z) in the South Sabah Al-Ahmad residential project(PAHW / MEW)
Contract No.: PAHW/C/1595-2024/2025, Supply, Installation, Implementation, and Maintenance of a main station with a voltage of 400/132/11 kV (2Z) in the South Saad Abdullah Mubarak residential project (PAHW / MEW)
Contract No.: MEW/C/5659-2021/2022 Supply and Installation of SHPT "W" 300KV Substation.
Contract No.: CA/CSPD/0115 Replacement of Old & Obsolete Substation M20 at MAA Refinery.
PAHW/C/1361-2018/2019 Supply & Installation of 9 nos 132/11 kV substations at Mutlaa City (Area N6, N7 & N10)
PAHW/C/1362-2018/2019 Supply & Installation of 9 nos 132/11 kV substations at Mutlaa City (Area N8, N9 & N11)
PAHW/C/1363-2018/2019 Supply & Installation of 4 nos 132/11 kV substations at South Abdullah Al Mubarak Town
Contract No: MEW/C/4433-2011/2012- Supply and Installation of 8 no’s of 132/11KV S/S at Arai ‘E’, Jwan ‘B’, SHND ‘B’, ABFT ‘A’, FHPT ‘A’, Amiri ‘A’, Adana’A & CMNT ‘A’ Substations.
Supply and Installation of 132/11KV Substation of Shagaya SGRE ‘A’, Contract No.: 137762. Client: Kuwait Institute for Scientific Research. KISR Representative: Ministry of Electricity & Water.
Job Responsibilities
Attending meeting with MEW / KNPC / KOC and contractors for project status, Energization meetings, getting approvals, and issues.
Review and approve all site SAT reports, Drawings, and Schemes for the above-said projects.
Preparing T&C schedule / 3-week schedule / Micro schedule / Shutdown T&C schedule at different sites.
Witnessing all Major activities in GIS/TRANSFORMER/SWGR/SCS/LVAC/DCCB/Battery Charger Component and Functional Scheme checks, etc.
Co-ordinate with site representatives, clients & contractors to resolve the site issues.
Attending all the Emergency calls/alarm troubleshooting in live substations.
Total Work Experience: 21 Plus
Kuwait Experience: Apr 2015 to Till Date
Qatar Experience: 7 plus
India experience: 4 plus
Senior Testing and Commissioning Engineer
M/S. Voltech engg. pvt ltd. (India)
03.2006 - 03.2015
Working as Senior Testing and Commissioning Engineer for M/S. Voltech Engg. Pvt Ltd. (India) for the following projects.
Talented, Qualified, and experienced professional with Excellent Knowledge of Engineering / Management aspects, ranging from Concept to commissioning of Electrical Projects, with a proven track record of experience over 18 years under reputable organizations that suit the handling of various Job Responsibilities in the concerned field
Strengths: Completing Projects on time / ahead of schedule, Substation / Protection System / Testing, and commissioning of Substations
LNGG
Tamil, English, Hindi.
EXTRA CURRICULAR ACTIVITIES
Participated in National Level Technical Symposium held at Karunya Institute of Technology, Coimbatore, on the topic ‘High Tech Numeric Motor Protection Relay’. Participated in Intra College Technical Symposium on the topic 'Sociotechnical Transmission of Electrical Power'. (HVDC)