Summary
Overview
Work History
Education
Skills
Certification
Projects
Timeline
Generic

Talal Hasan

Petroleum Engineer
Kuwait City,Salwa, Block 8, Street 3, Building 47, Flat 3

Summary

Enthusiastic Petroleum Engineer eager to contribute to team success through hard work, attention to detail and great organizational skills. Always motivated to learn, grow and excel in any position am assigned to.

Overview

3
3
Certificates
5
5
years of post-secondary education

Work History

Mud Engineer

KOC/ CPVEN
Kuwait City, Kabed
02.2021 - Current
  • Made mud mixtures based on a recipe received from the KOC.
  • Frequently working with different types of mud such as oil based mud or water base mud.
  • Performed pilot tests and analyses on mud mixtures used for drilling.
  • Had a three month training on rig and drilling related concepts and operations.
  • Adhered to social distancing protocols and wore mask or face shield at all times.
  • Demonstrated respect, friendliness and willingness to help wherever needed.

Education

Bachelor of Science - Petroleum Engineering

West Virginia University
United States
08.2013 - 08.2018

Skills

Worked with PETRA - A Geological Interpretation Software

undefined

Certification

General HSE Training

Projects

  • Senior Design Project:
    - The main objective of the project was to validate and use new technology to improve the recovery and minimize the
    environmental implications of an unconventional reservoir.
    - Design was for "Marcellus Shale Energy and Environmental Laboratory"
    - Economic Analysis was also performed for this project.
  • Formation Evaluation Project:
    - The objective of this project was to evaluate several formations to find the pay zone.
    - Also, Porosity, Water Saturation, and Permeability were also found for each zone.
    - Project was done by PETRA software
  • Design of A Drill Assembly:
    - The goal was to come up with a drilling assembly design for a specific drilling site.
    - Information was gathered for the desired site and also for adjacent drilling sites.
    - Calculations such as, drill pipe and drill collar calculations were then performed based on the researched information.
  • Decline Curve Analysis:
    - Performed a Decline Curve Analysis using ARP's Method given the production data of a specific well.
    - Performed a Decline Curve Analysis using DUONG's Method given the production data of a specific well.
    - Both models were compared on a History Match Plot.
    - Project was done using CMG software and Excel.

Timeline

Mud Engineer

KOC/ CPVEN
02.2021 - Current

Certified First Aider

02-2021

General HSE Training

01-2021

Field Specific HSE Training

01-2021

Bachelor of Science - Petroleum Engineering

West Virginia University
08.2013 - 08.2018
Talal HasanPetroleum Engineer