Summary
Overview
Work History
Education
Skills
Certification
Software
Accomplishments
Accomplished the following block successful shut downs
Work Availability
Timeline
Hi, I’m

VINOTH KUMAR S

MECHANICAL MAINTENANCE ENGINNER
Virudhunagar
Price is what you pay. Value is what you get.
Warren Buffett

Summary

Mechanical Maintenance Supervisor and seasoned Maintenance Engineer with over 6+ years of successful experience in supervision and planning bringing demonstrated safety management and performance optimization skills gained during experience in preventive,emergency and shutdown maintenance. Advanced skills in Primavera Project Management P6 , MS Office as well as job-specific tools and equipment. Knowledgeable about heavy equipment usage in specific conservation strategies. strengths in Mechanical Maintenance , Material and Planning backed by working in oil and Refinery sector.

Overview

6
years of professional experience
4
years of post-secondary education
4
Certifications
4
Languages

Work History

ARABI ENERTECH KSC
KNPC - MINA AL AHMADI

Mechanical Maintenance Supervisor
10.2018 - Current

Job overview

  • Enhanced customer satisfaction ratings by motivating team members to strengthen quality and increase productivity.
  • Monitored equipment, tools and system upgrades to compile data into detailed reports for upper management.
  • Organized ongoing maintenance schedules to boost system performance.
  • Kept watchful eye on equipment inventories, optimizing work readiness and aligning supplies with specifications for each job.

M/S ARABI ENERTECH KSC., JGSK
KNPC - MINA AL AHMADI

Piping Supervisor
07.2018 - 09.2018

Job overview

  • Supervised layout, assembly and installation of various sizes and types of drainage pipes.
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Reviewed and approved employee time reporting.
  • Devised and implemented safety protocols to reduce risks on construction and extraction sites.
  • Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Provided feedback to workers on job performance and safety procedures.
  • Inspected equipment and tools used for safe operation.
  • Trained workers in proper methods, equipment operation and safety procedures.

ARABI ENERTECH KSC .,
KNPC- MINA AL AHMADI

Mechanical Maintenance Supervisor
10.2017 - 05.2018

Job overview

  • Monitored equipment, tools and system upgrades to compile data into detailed reports for upper management.
  • Organized ongoing maintenance schedules to boost system performance.
  • Kept watchful eye on equipment inventories, optimizing work readiness and aligning supplies with specifications for each job.
  • Utilized proper tools and materials to adhere to safety guidelines.
  • Managed efficient teams of up to 200 employees.
  • Monitored priorities and liaised between maintenance team and management, delegating tasks to complete on time.
  • Monitored safety compliance to maintain strict standards and protect team members from harm.

Education

VSB ENGINEERING COLLEGE
KARUR,TAMILNADU

Bachelor of Engineering from Mechanical Engineering
06.2013 - 04.2017

University Overview

  • Member of KUWAIT SOCIETY OF ENGINEERS - KSE ., sr no.: 71487
  • Completed and Certified professional software development in PRIMAVERA P6 -Project Management Planning
  • Member of SAE - Society of Automotive Engineers.,
  • Professional development completed and certified in Auto CAD, CREO PARAMETRIC 12.0

Skills

    MS Office

undefined

Certification

Induction courses and programs in safety Training

Software

PRIMAVERA PROJECT MANAGEMENT

AUTOCAD 2014

ANSYS 120

CREO PARAMETRIC

MAXIMO

Accomplishments

  • HSR & TGT ( HYDROGEN SULPHUR REMOVAL ) UNIT -MAY 2023.
  • CDU ( CRUDE DISTILLATION UNIT ) UNIT - NOV 2022.
  • BITUMEN & EOCENE UNIT - MAR 2022.
  • FCC ( FLUID CATALYTIC CRACKING ) UNIT - OCT 2022.
  • ARD 1 & 2 ( ATMOSPHERIC RESIDUE DE-SULPHURIZATION ) UNIT - JAN 2021.
  • CCR 1 ( CONTINOUS CATALYTIC REFORMING ) UNIT - SEP 2020..
  • TRAIN 3 ( LPG GAS PLANT ) UNIT - SEP 2019
  • HCR ( HYDRO CRACKER UNIT ) UNIT - JULY 2019.
  • ARD 1 & 2 ( ATMOSPHERIC RESIDUE DE-SULPHURIZATION ) UNIT - MAR 2019.
  • ARD 3 & 4 ( ATMOSPHERIC RESIDUE DE-SULPHURIZATION ) UNIT - JAN 2019.
  • NEW GOD ( GAS OIL DESULPHURIZATION ) UNIT JAN 2018 -FUP MRTA.
  • BITUMEN UNIT- DEC 2017.
  • AGRP UNIT ( ACID GAS REMOVAL PLANT ) UNIT - OCT 2017.

Accomplished the following block successful shut downs

SHUTDOWN

Availability
See my work availability
Not Available
Available
monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Work Permit system by KNPC

01-2020

Confined Space Entry and Attendant training by KNPC

04-2019

Mechanical Maintenance Supervisor

ARABI ENERTECH KSC
10.2018 - Current

HSE Training - Policy by ARABI ENERTECH KSC & KNPC

09-2018

Piping Supervisor

M/S ARABI ENERTECH KSC., JGSK
07.2018 - 09.2018

Induction courses and programs in safety Training

12-2017

Mechanical Maintenance Supervisor

ARABI ENERTECH KSC .,
10.2017 - 05.2018

VSB ENGINEERING COLLEGE

Bachelor of Engineering from Mechanical Engineering
06.2013 - 04.2017
VINOTH KUMAR SMECHANICAL MAINTENANCE ENGINNER