Dynamic and results-driven Piping Construction Manager with 14+ years of experience leading large-scale oil and gas projects. Proven ability to successfully plan, execute, and complete complex piping projects within budget and schedule, while adhering to the highest safety and quality standards. Expertise in all phases of construction, from design and procurement to installation, testing, and commissioning. Possesses strong leadership, communication, and problem-solving skills, with a demonstrated track record of building and motivating high-performing teams Adept at risk mitigation, stakeholder collaboration, optimizing work flows, implementing industry best practices and delivered projects on schedule.
Overview
14
14
years of professional experience
Work History
Deputy Manager
Mark Technologies
01.2023 - Current
Led and managed piping construction activities for the 11 Patterns Well Hookup and Associated Piping Works ensuring compliance with ASME, API, and client specifications
Collaborate with engineering, procurement, and project control teams to ensure smooth project flow
Developed and implemented detailed construction plans, schedules, and budgets, monitored progress, and resolved technical challenges to maintain project timelines ensuring efficient resource allocation and cost control
Oversaw all aspects of piping construction, including material procurement, fabrication, installation, welding, testing, and commissioning
Effectively communicated project progress and performance to stakeholders, including clients, management, and contractors
Implemented HSE best practices, conducted safety audits, and ensured a zero-incident worksite
Provided technical support to engineering, procurement, and commissioning teams, enhancing cross-functional collaboration
Controlled budgets, reduced project costs through value engineering, and improved efficiency
Lead Engineer
Dodsal Engineering & construction
04.2016 - 12.2022
Lead and managed the Piping construction activities of the 750 million New Gathering Centre, GC-31 EPC project in North Kuwait from the Initial stage to the Turnover Date
Develop construction strategies, schedules, and work breakdown structures (WBS) for piping activities
Ensure piping fabrication, installation, and testing align with the project execution plan
Collaborate with Coordinated with engineering, procurement, and project control, fellow disciplines addressing any issues that arose during the construction process to keep projects on track to ensure smooth project flow
Lead the piping construction team of Engineers, supervisors, foremen and Direct Resources ensuring the smooth completion of the fabrication of 450000 ID, erection of 22000 spools and Hydrotesting of 1450 Test packs
Monitor daily progress, ensuring work is executed as per specifications, drawings, and client requirements
Oversee material management, ensuring timely delivery and availability of pipes, fittings, and supports
Attend progress review meetings and provide weekly/monthly reports on piping activities with client representatives
Address technical queries (RFIs) and coordinate with design teams for necessary changes and modifications
Monitor project budgets, cost estimates, and resource allocation to prevent overruns, optimize manpower, equipment, and material usage to maximize efficiency
Calculations and supervision for the hydrostatic testing, flushing, leak testing and purging of the piping systems
Ensure completion of punch lists before mechanical completion and system handover
Coordinate with the commissioning team for system start-up supported for the stable operations
Prepare and submit as-built drawings, test reports, and project documentation for final handover
Piping Engineer
Dodsal Engineering & construction
04.2016 - 12.2022
Review construction drawings, P&IDs, isometrics, and general arrangements (GA) drawings
Assist in developing construction schedules, work sequences, and resource planning
Site Execution overall of piping fabrication and erection works include identification of materials, inspection of site as per isometric, GAD and P&ID
Execution of contra tracing and steam tracing for the Jacketed Sulphur piping which included from the material calculation site routing and Hydrotesting
Ensure compliance with ASME, API, ASTM, ANSI, and project-specific standards
Conduct material inspections, fit-up checks, and dimensional verification
Supervise hydrostatic testing, pneumatic testing, flushing, and leak tests
Ensure completion of punch lists, reinstatement of lines, and mechanical completion
Support pre-commissioning and commissioning teams during system start-up
Preparation of different types of work permits for the mechanical activities, attend the Permit to Work training classes, identify & control the hazards, site visit with client, preparation for site audit
Enforce safety standards, PPE compliance, and risk assessments on-site
Conduct toolbox talks, safety audits, and permit-to-work (PTW) inspections
Ensure adherence to LOTO (Lockout/Tagout), confined space entry, and hot work permits
Maintain daily progress reports, inspection reports, and work logs
Update as-built drawings and final project documentation for handover, ensure proper documentation for material traceability, weld maps, and test records
Piping Engineer
Jobby Engineers Pvt Ltd
06.2011 - 01.2013
Review construction drawings, P&IDs, isometrics, and general arrangements (GA) drawings
Assist in developing construction schedules, work sequences, and resource planning
Site Execution overall of piping fabrication and erection works include identification of materials, inspection of site as per isometric, GAD and P&ID
Execution of contra tracing and steam tracing for the Jacketed Sulphur piping which included from the material calculation site routing and Hydrotesting
Ensure compliance with ASME, API, ASTM, ANSI, and project-specific standards
Conduct material inspections, fit-up checks, and dimensional verification
Supervise hydrostatic testing, pneumatic testing, flushing, and leak tests
Ensure completion of punch lists, reinstatement of lines, and mechanical completion
Support pre-commissioning and commissioning teams during system start-up
Preparation of different types of work permits for the mechanical activities, attend the Permit to Work training classes, identify & control the hazards, site visit with client, preparation for site audit
Enforce safety standards, PPE compliance, and risk assessments on-site
Conduct toolbox talks, safety audits, and permit-to-work (PTW) inspections
Ensure adherence to LOTO (Lockout/Tagout), confined space entry, and hot work permits
Maintain daily progress reports, inspection reports, and work logs
Update as-built drawings and final project documentation for handover, ensure proper documentation for material traceability, weld maps, and test records
Education
B Tech - Mechanical Engineering
Mahatma Gandhi University
Kerala
PG Diploma - Plant Design & Management System (PDMS)
Certificate - Process Piping & Design
ASNT Level-II - PT, MT, RT & UT
Skills
Planning
Area Of Expertise
Planning, scheduling, and coordinating piping construction activities
Budgeting and cost control
Ensuring compliance with contractual obligations
Managing resources, material and manpower
Coordination with engineering, procurement and client representatives
Conflict resolution, team leadership and workforce management
Enforcing HSE policies and ensuring a safe worksite
Quality assurance adhering to applicable industrial and local standards
Stakeholder coordination & client relations
Ensure documentation and turnover to operations
Vendor & contractor coordination
Major Projects Handled
11 Patterns Well Hook-Up & Associated Works, SHBC/KOC, 16000000
New Gathering Centre, GC-31 In North Kuwait, KOC, 740000000
Shah Gas Development, UAE, SAIPEM/AL HOSN, 750000000
MRPL Phase 3 Expansion, India, EIL/ONGC, 3500000
Personal Information
Passport Number: V5163522
Health Status: Fit
Date of Birth: 07/15/89
Nationality: Indian
Driving License: 289071506535
Civil Id
289071506535
Timeline
Deputy Manager
Mark Technologies
01.2023 - Current
Lead Engineer
Dodsal Engineering & construction
04.2016 - 12.2022
Piping Engineer
Dodsal Engineering & construction
04.2016 - 12.2022
Piping Engineer
Jobby Engineers Pvt Ltd
06.2011 - 01.2013
B Tech - Mechanical Engineering
Mahatma Gandhi University
PG Diploma - Plant Design & Management System (PDMS)
Office Manager/Company Owner at Mark Kerns Trucking, Inc / Mark Kerns Trucking, LLCOffice Manager/Company Owner at Mark Kerns Trucking, Inc / Mark Kerns Trucking, LLC
Guest Experience Supervisor & Brand Liaison at The Mark Hotel ft. The Mark Restaurant by Jean Georges and Caviar KaspiaGuest Experience Supervisor & Brand Liaison at The Mark Hotel ft. The Mark Restaurant by Jean Georges and Caviar Kaspia